Prices by type of work with a breakdown. Estimates tsn and fer Example of the ussr for repair in tsn

What is the difference between TSN base and FER?

Very often there is a question about how the FER base differs from TSN? In addition to the "external" difference that everyone is talking about, there are a few more.

At the moment, there are many editions of the FER database, but from April 28, 2017, a new regulatory framework, the so-called "FER edition of 2017" (you can read more about the adventures of this database) and the TSN Moscow database with addition 43, will come into effect.

Let's start with the level of use of the regulatory framework.

The FER 2017 base is used to calculate estimates with the involvement of funds federal budget, and the TSN base is for the funds of the regional budget of Moscow, but both bases have no restrictions on their use for drawing up commercial estimates. Developers of regulatory frameworks are also different, information on the implementation of these standards can be found in the register on the website.

Let's turn to her appearance:

This is what the FER base looks like. We see the "familiar to the eye" rate ciphers.

And a completely different cipher of prices TSN Moscow, containing the chapter number (the first digit to the dot).


Based on the difference in ciphers, we can conclude that impossibility of automatic recalculation from one base to another.

As we can see, the composition of construction work is approximately the same, judging by the table of contents, but this does not mean that the costs will be the same. But the rates of labor costs, the cost of work at the basic and current levels differ very significantly. In addition, in the TSN-Moscow database itself, there are prices that are not in the FER database, an example is the following screenshot - prices for city decoration.


Also in the normative base of TSN Moscow there are separate collections at the current price level.


I would also like to note the "open prices" in the TSN Moscow database - unaccounted resources in this database are displayed with the OKP code.

OKP is the all-Russian product codifier. This classifier makes it easier to select materials that are not included in the price.


In addition, another distinctive feature is the way of calculating the transportation of goods and construction waste. In the TSN base, the transportation of garbage and soil is attributed to other costs and does not fall into the construction and installation work, and in the list of other works and costs for the FER base there is no transportation, respectively, this is construction and installation work.

The calculation of relocation of equipment in the TSN database is made in separate prices. Whereas in the FER base - The costs of relocating construction machines, not included in the estimated prices for the operation of construction machines, are taken into account in estimate documentation a separate line based on calculations that take into account the actual conditions of transportation, installation and dismantling of machines in accordance with the project for the production of works.

In cases where deviations between the actual costs of relocating construction machines and mechanisms and the costs provided for in the cost of 1 machine-h of work of construction machines exceed 10%, the cost of costs for relocating construction machines and mechanisms should be taken into account directly in local estimates, with the exception of the cost of 1 machine-h of construction machines, the estimated cost of the costs of their relocation.

Let's look at the difference between overhead and estimated profit. For the TSN base, different NR and SP for repair and construction work were calculated at the current price level, taking into account all possible coefficients and are contained in the indices.


Accrual of HP and SP is made separately from the wages of the main workers and the wages of machine operators.

Overhead costs and estimated profit, calculated from the wages of workers employed in the main production, should be taken in accordance with the norms introduced from 01.01.2017 by order of Moskomexpertiza dated December 26, 2016 No. MKE-OD / 16-73.

Overhead costs and estimated profit for the operation of construction machines and mechanisms are determined, respectively, in the amount of 98% and 69% of the wages accounted for in the item "Operation of machines". The norms of HP and SP for the salary of drivers are the same for all rates.


And for the FER base, we use the value of HP and SP from the MDS, taking into account the coefficients from the letters of the Ministry of Regional Development. Accordingly, for the TSN database, there is no need to subtract bales of letters about the rules for calculating, rounding and applying coefficients, as in the FER database, which greatly simplifies the calculation.

development of estimates and calculations, KS-2 and KS-3 in the actual bases of federal and territorial prices.

Construction contractors of the city of Moscow are offered services for budgeting according to state regulations:

According to the territorial prices TSN;

According to federal regulations at base and current price levels;

Based on elemental tables of standard consumption of building resources;

We offer estimate services on the compilation of calculations in TSN Moscow, FER, GESN and industry standards. To estimate the cost of the estimator's work, you can send a project, drawings, a statement of construction and installation volumes, a specification for equipment or materials, other materials according to the construction procedure to the e-mail [email protected] (tel. +7 952-827-6903). The object of construction and repair work can be buildings (production workshops, warehouses, stations, residential buildings, boilers, tanks) and structures (water intake and treatment structures, bridges, tunnels, dams, platforms, etc.) with related inventory, equipment, furniture, auxiliary premises and utilities (water, energy and heat supply, gasification and sewerage). The cost of developing estimate documentation in TSN Moscow and other bases is minimal, the ratio of price, speed and quality is optimal! about working conditions with the company ...

Budgeting in TSN for Moscow

Like the federal (territorial) rates of the current TSNB, the estimated standards in the TSN are considered the base level on the first day of 2000. Thus, the wages of construction workers, tariffs and prices for other resources of material and technical support are calculated at the level of Moscow prices as of 01.01.2000. Unlike TEPs and FERs operating at the national or regional level, TSN-2001 is a base developed for determining the cost of construction and installation work, i.e. drawing up estimates for the objects of the city of Moscow. It is noteworthy that the Moscow region, like most other regions, has its own territorial base of standards, hereinafter TEP of the Moscow region. The scope of TSN collections includes prices for repair, construction and restoration work of buildings and structures, tables for installation and commissioning of engineering equipment. In other words, the base is used to draw up estimates for social, historical, cultural and industrial facilities, technological equipment, housing and communal services in Moscow. The structure of TSN is similar to the list of collections of FERs and TEPs, it also includes price sets for construction, installation, repair and commissioning, plus an additional collection for the restoration of cultural and historical objects of the city of Moscow. All collections consist of tables of estimated standards, supplemented by a technical part containing general provisions and rules for the use of standards. One of the basic principles of drawing up estimated standards is simple averaging, which implies that the consumption of material and technical resources required for the implementation of construction and installation works is taken as an average, and the working conditions are normal. Collections of prices for building resources: structures, materials and operation of machines are also called average. Average prices for materials TSN-2001.1 are used to assess the cost of material and technical products and structures in the price, and the average prices for the operation of TSN-2001.2 equipment fix the cost of one machine-hour, incl. the salary of drivers who deliver, install, operate, maintain, and also carry out routine repairs of construction equipment and tools.

The structure of the TSN pricing, the scope of which, in addition to construction and installation work, installation and commissioning of equipment, includes tables for marking the restoration, maintenance and repair of technoparks in Moscow, festive decoration and maintenance of objects in the capital environment, includes:

Measuring instrument of works, structures or other resource;

Workers' wages;

Operation of construction equipment (EM), incl. salary of drivers;

Materials, the cost of which is taken into account by the standard;

ЗТР - labor costs of working personnel without hours of drivers, taken into account in the cost of EM;

Consumption of materials that are not included in the price, but are indicated in natural units, etc.

The local estimate, being the basic estimate documents, is drawn up for construction, repair, restoration, installation and commissioning works, as well as for the maintenance of machines and equipment, maintenance of urban infrastructure facilities, etc. elements of the building structure. To calculate the amount of work when drawing up an estimate for TSN for Moscow, you can use a statement or working drawings, according to which calculations of the main quantitative parameters of construction or repair are made. Estimates for installation in Moscow prices are drawn up on the basis of specifications, which indicate the nomenclature, basic indicators and the number of equipment units. The cost of construction and installation work is calculated according to TSN standards, taking into account the estimated profit, overhead and limited costs accrued in the prescribed manner. When using building price lists of the city of Moscow to mark reconstruction or major repairs, additional coefficients are applied to the elements of direct costs (1.15 - to the cost and physical indicators of labor costs, 1.25 - to the costs of operating equipment and tools). At the same time, the use of tables of building collections can only be due to the absence of such prices in the repair parts of TSN.

The object estimate is a combination of several local estimate calculations compiled in a table according to a template containing construction and installation works and purchased equipment, furniture, inventory and building materials in value terms, as well as accrued VZiS - funds for the installation of temporary structures and additional costs.

The summary estimate calculation includes a list of chapters, where construction works, objects are divided by cost type. The structure of a standard SSR consists of several chapters: 1) preparation of a construction site, 2) main construction projects (cost of buildings and main works), 3) service facilities, 4) energy facilities, 5) Transport infrastructure, 6) external networks: sewage, heat, gas and water supply, 7) improvement, 8) temporary structures (buildings), 9) other costs, etc. *

* The structure and titles of the chapters of the consolidated estimate calculation are painted schematically. To clarify the standard type of calculation, refer to the reference literature, where the CCP template is often added as an appendix.

Despite the fact that the Moscow region acquired its name due to its de facto center, the metropolis itself is a separate administrative unit that is not part of the region itself. Thus, estimates for construction and installation work in Kolomna, Podolsk, Zhukovsky or Krasnogorsk are usually compiled in the TEP database of the Moscow region, and construction or repair work within the city of Moscow is estimated at TSN rates. The construction infrastructure of the region is actively developing; the region is considered one of the most urbanized and densely populated. The proximity of the capital is determined by the economic and geographical features of the Moscow region and a huge number of economic entities: more than two hundred thousand enterprises and organizations, of which about 20 thousand work in construction industry... Budgeting, which is an integral part of construction, repair or installation work, can be done at commercial or government rates.

Due to the highly qualified labor potential and powerful scientific and technical potential, the Moscow region occupies one of the leading positions in terms of production indicators among other regions. Historically, the segments of the industry were dominated by mechanical engineering and metalworking, to which today the food, construction and furniture industries can be added to the number of priority sectors. High indicators of demand for real estate in Moscow determine the rapid development of the construction industry, incl. production of building materials: bricks, insulation, ceramics, dry cement mixtures, etc. Integrated urban development, mainly in the format of multi-storey construction, is actively continuing, despite the high level of housing stock for Muscovites. The territorial standards of the Moscow region and the TSN of Moscow contain a comprehensive list of prices for the preparation of estimates for new construction, overhaul of existing housing, improvement, connection to engineering networks, road construction. Competent work of a specialist in estimated pricing, correct use of regional price bases and state standards is an important part of any construction and overhaul. A professionally drawn up estimate is an integral part of any project for construction, installation, commissioning or repair work, expressing their cost in monetary terms and helping to accurately estimate the costs required for the production of construction and installation works in Moscow and the Moscow region.

TSN are used to determine the estimated cost of new facilities, reconstruction, technological re-equipment directly for the city of Moscow. Estimating TSN is similar to other programs and has the same methodology for calculating the amount of work in prices. How to read the estimate according to TSN rates in Moscow?

The heading is filled in according to the Contract Agreement:

  • I affirm
  • Agreed,
  • Base,
  • Compiled as of ...

Decoding of the TSN estimate. The main data table consists of 10-11 columns:

  • № п / п - number in order;
  • Price code and resource codes (coefficient justification) - apply from ready-made estimate collections;
  • Name of work and costs - explanation to the code with a detailed description of the type of work;
  • Unit. - natural value corresponding to the meter;
  • Quantity - by project or volume sheet;
  • Unit price, rubles - base price for TSN in Moscow in 2001, excluding VAT;
  • Correction factors - in the presence of tightness at the facility, the base price is adjusted with a special coefficient taking into account the special conditions of the staff;
  • The coefficient of winter increases in prices - if the work is performed during a cold period of time;
  • Conversion factor - inflation index to the estimated TSN prices in current prices (added from a monthly calculation by cost items);
  • Total costs, rubles - multiplication of columns: 5,6,7,8,9 - this is the current price at the time of the estimate with the current translation index;
  • When reading the estimate of TSN for Moscow, it should be borne in mind that there are works and materials. In addition, the overhead costs of HP and the estimated profit of the joint venture from the wages of the main workers of the RFP, and the HP and the joint venture from the salary of the mechanics of the RFP are charged. Their value is fixed as a percentage for each type of work. This can be clearly seen under the name of each rate.
  • ZTR is the labor input of workers per person hour;
  • "Supplier's price" - this wording means that the price is accepted in the estimate for the invoice, price list, commercial proposal (which must be attached to check the set by the Customer) without VAT (VAT is charged separately at the very end of the document, therefore it is initially removed from the unit cost ). The Customer is not always allowed to accept such a price, since there are ready-made items with such materials in the collections of estimated prices.

We read the results of the TSN estimate:

  • For each section, the results of the TSN collections are summed up (it is necessary to read from top to bottom);
  • The results of the TSN estimate of Moscow are read in the same way as the results of the sections, having previously summed them up.