Sp 11 110 99 updated edition. Form of the list of contractors carrying out construction and installation work

SP 11-110-99

CODE OF RULES FOR DESIGN AND CONSTRUCTION

THE SUPERVISION OF AUTHORS FOR CONSTRUCTION OF BUILDINGS AND STRUCTURES


Introduction date 1999-07-01

FOREWORD

1 DEVELOPED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia, the Russian Society of Civil Engineers (ROIS) and State enterprise- Center for scientific and methodological support of engineering support of investments in construction (SE "TSENTRINVESTproekt") of the Gosstroy of Russia

2 REPRESENTED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

4 INSTEAD OF SNiP 1.06.05-85

Amended as published in the Newsletter, Issue 1, January 2000.

The amendment was made by the database manufacturer.

INTRODUCTION

INTRODUCTION

Architectural supervision is one of the types of services provided to the customer in accordance with the contract by the developer working documentation for the construction of the facility.

This Code of Rules contains recommendations on the organization and conduct of architectural supervision.

1 AREA OF USE

1.1 This document establishes the recommended provisions for organizing and maintaining field supervision at construction sites*.
____________
* The concept of "construction" includes new construction, expansion, reconstruction and technical re-equipment.

1.2 The document is intended for use by developers project documentation(hereinafter - designers), developers (hereinafter - customers), construction and installation organizations, bodies state supervision, other legal and individuals(including foreign ones) - participants in the investment process in the construction of facilities.

1.3 The document is mandatory in the following cases:

the need for architectural supervision is established by law;

the implementation of architectural supervision in accordance with this joint venture is provided for by an agreement between the customer and the designer or by the administrative document (order) of the organization that designs, invests and builds the facility.

2 REGULATORY REFERENCES

This Code of Practice makes reference to the following standards:

GOST 2.105-95 ESKD. General requirements to text documents;

GOST 21.101-97 SPDS. Basic requirements for design and working documentation.

3 DEFINITIONS

In this regulatory document, the following terms are used with their respective definitions.

3.1Author's supervision- one of the types of services for the supervision of the author of the project and other developers of project documentation (individuals and legal entities) for construction, carried out in order to ensure that the decisions contained in the working documentation comply with the construction and installation work performed at the facility. The need for architectural supervision is within the competence of the customer and, as a rule, is established in the assignment for the design of the object.

3.2Treaty- the main document regulating the relationship of the parties, establishing their rights and obligations for the implementation of architectural supervision in the contract method of organizing design. This agreement may provide for technical supervision.

3.3Customer(developer) - a natural or legal person who organizes and finances the construction of an object.

3.4Contractor- an individual or legal entity that is the executor of construction and installation works at the construction site.

3.5Designer- an individual or legal entity that, as a rule, has developed working documentation for the construction of an object and carries out architectural supervision.

3.6Administrative document(order) - the main document for the implementation of architectural supervision in the design, investment and construction of an object by one organization.

4 ORGANIZATION OF AUTHOR'S SUPERVISION

4.1 Architectural supervision is carried out on the basis of an agreement (regulatory document) and is carried out, as a rule, during the entire period of construction and commissioning of the facility, and, if necessary, the initial period of its operation.

4.3 Author's supervision in case of its implementation legal entity carried out by specialists - developers of working documentation, appointed by the management of the organization. As a rule, the chief architect or chief engineer of the project is appointed as the head of the specialists exercising architectural supervision.

4.4 Appointment of the manager and specialists responsible for the design supervision is made by order of the organization and brought to the attention of the customer, who informs the contractor and the State Architectural and Construction Supervision authorities about the decision.

4.5 Specialists who carry out architectural supervision go to construction site for intermediate acceptance of critical structures and survey of concealed works within the time frame stipulated by the schedule, as well as at the special call of the customer or contractor in accordance with the contract (regulatory document).

4.7 The customer is obliged to provide specialists who carry out field supervision with equipped service premises, means of communication, transport, etc. in accordance with the contract.

5 PROCEDURE FOR KEEPING THE AUTHOR'S SUPERVISION JOURNAL

5.1 When carrying out field supervision of the construction of an object, a log of field supervision of construction * (hereinafter referred to as the log) is regularly maintained, which is compiled by the designer and transferred to the customer. Forms for filling out the journal are given in Appendix A.
_____________
* The agreement may provide for a copy of the journal.

5.2 Keeping a journal can be carried out both for the construction site as a whole, and for its start-up complexes or individual buildings and structures.

5.3 The design of the journal must be carried out in accordance with GOST 2.105. The journal must be numbered, laced, decorated with all signatures on the title page and sealed with the customer's seal. The magazine is transferred by the customer to the contractor and is located at the construction site until it is completed. The journal is filled in by the head or specialists exercising architectural supervision, the customer and an authorized person of the contractor.

After construction is completed, the contractor hands over the magazine to the customer.

5.4 Each visit to the construction site by specialists is recorded in a journal. The record of the work carried out on field supervision is certified by the signatures of the responsible representatives of the customer and the contractor. Recording is also carried out in the absence of comments.

5.5 Records and instructions of specialists are set out clearly, with the necessary references to the current building codes and regulations, state standards, technical specifications.

6 BASIC RIGHTS AND OBLIGATIONS OF SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION

6.1 Fundamental rights

6.1.1 Access to all construction sites under construction and places of construction and installation works.

6.1.2 Familiarize yourself with the necessary technical documentation related to the construction site.

6.1.3 Monitoring the implementation of the instructions entered in the log.

6.1.4 Making proposals to the bodies of the State Architectural and Construction Supervision and other bodies of architecture and urban planning to suspend, if necessary, construction and installation work performed with identified violations, and to take measures to prevent violation of copyright in a work of architecture in accordance with the law.

6.2 Key responsibilities

6.2.1 Selective verification of compliance of construction and installation works with working documentation and requirements building codes and rules.

6.2.2 Selective control over the quality and compliance with the technology of production of works related to ensuring the reliability, strength, stability and durability of structures and installation of process and engineering equipment.

6.2.3 Timely resolution of issues related to the need to make changes to the working documentation in accordance with the requirements of GOST 21.101, and control over execution.

6.2.4 Facilitate the familiarization of workers carrying out construction and installation work, and representatives of the customer with design and working documentation.

6.2.5 Informing the customer about the untimely and poor-quality implementation of the instructions of the specialists who carry out architectural supervision, in order to take prompt measures to eliminate the identified deviations from the working documentation and violations of the requirements normative documents.

6.2.6 Participation:

in the examination of works hidden by the construction of subsequent structures, the quality of which determines the strength, stability, reliability and durability of the buildings and structures under construction;

in acceptance in the process of construction of individual critical structures.

6.2.7 Regular logging and performance of other works and services specified in the contract (regulatory document).

Annex A (mandatory) FORMS FOR COMPILING AND KEEPING THE AUTHOR'S SUPERVISION JOURNAL

Annex A
(mandatory)

Form title page*

________________
* The form of the magazine, including the title page, as a rule, is A4.

Name of the construction object

Construction address

Customer

(name, address)

Designer

(name, address of the design organization or design unit)

Journal started

The magazine is over

(date)

(date)

Head of designer

(signature)

Customer manager

(signature)

Form of the list of contractors carrying out construction and installation work

LIST OF CONTRACTORS CARRYING OUT CONSTRUCTION AND INSTALLATION WORKS

Work Executor ( general contractor, contractor)

Performers of certain types of work (subcontractors):

(name of work - construction and installation organization)

Form of the list of specialists exercising architectural supervision

Full Name

Design organization, position, phone number

Date and N of the document on authority to conduct architectural supervision

Registration form

REGISTRATION SHEET OF THE SITE VISIT BY SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION OF THE CONSTRUCTION

Name of company

Full Name

Signature of the customer's representative

arrival

Account form

RECORD SHEET N __________

Identified deviations from the design and estimate documentation, violations of the requirements of building codes and regulations and specifications for the production of construction
installation work

Instructions on the elimination of identified deviations or violations and the timing of their implementation

Specialist's signature
implementing
architectural supervision of the person who made the entry (surname, initials, position)

Representative familiarized with the record:
a) a contractor; b) customer (surname, initials, position, date)

Follow-up mark:
a) a contractor;
b) customer (surname, initials, position, date)


UDC 721.021:658.012.7

Key words: author's supervision, developers of design documentation, state supervision bodies, contract, customer, administrative document.
____________________________________________________________________________________________



Electronic text of the document
prepared by Kodeks JSC and verified against:
official publication
M.: Gosstroy of Russia, SE "TSENTRINVESTproekt",
ROIS, State Unitary Enterprise TsPP, 1999

SP 11-110-99 "Author's supervision of the construction of buildings and structures"

Code of rules for the design and construction of the joint venture 11-110-99

"Author's supervision of the construction of buildings and structures"

(put into effect by the resolution of the Gosstroy of the Russian Federation of June 10, 1999 N 44)

The supervision of authors for construction of buildings and structures

Instead of SNIP 1.06.05-85

see also Practical guide on the organization and implementation of architectural supervision of the construction of enterprises, buildings and structures

Introduction

1 area of ​​use

1.2 The document is intended for use by developers of project documentation (hereinafter referred to as designers), developers (hereinafter referred to as customers), construction and installation organizations, state supervision bodies, other legal entities and individuals (including foreign ones) - participants in the investment process during the construction of facilities.

1.3 The document is mandatory in the following cases:

the implementation of field supervision in accordance with this joint venture is provided for by an agreement between the customer and the designer or an administrative document (order) of the organization that designs, invests and builds the facility.

2 Normative references

GOST 2.105-95 ESKD. General requirements for text documents;

GOST 21.101-97 SPDS. Basic requirements for design and working documentation.

3 Definitions

In this regulatory document, the following terms are used with their respective definitions.

3.1 Author's supervision- one of the types of services for the supervision of the author of the project and other developers of project documentation (individuals and legal entities) for construction, carried out in order to ensure that the decisions contained in the working documentation comply with the construction and installation work performed at the facility. The need for architectural supervision is within the competence of the customer and, as a rule, is established in the assignment for the design of the object.

3.2 Treaty- the main document regulating the relationship of the parties, establishing their rights and obligations for the implementation of architectural supervision in the contract method of organizing design. This agreement may provide for technical supervision.

3.3 Customer(developer) - a natural or legal person who organizes and finances the construction of an object.

3.4 Contractor- an individual or legal entity that is the executor of construction and installation works at the construction site.

3.5 Designer- an individual or legal entity that, as a rule, has developed working documentation for the construction of an object and carries out architectural supervision.

3.6 Administrative document(order) - the main document for the implementation of architectural supervision in the design, investment and construction of an object by one organization.

4 Organization of architectural supervision

4.1 Architectural supervision is carried out on the basis of an agreement (regulatory document) and is carried out, as a rule, during the entire period of construction and commissioning of the facility, and, if necessary, the initial period of its operation.

4.3 Author's supervision in the case of its implementation by a legal entity is carried out by specialists - developers of working documentation, appointed by the management of the organization. As a rule, the chief architect or chief engineer of the project is appointed as the head of the specialists exercising architectural supervision.

4.4 Appointment of the manager and specialists responsible for the design supervision is made by order of the organization and brought to the attention of the customer, who informs the contractor and the State Architectural and Construction Supervision authorities about the decision.

4.5 Specialists who carry out architectural supervision go to the construction site for intermediate acceptance of critical structures and examination of hidden work within the time specified by the schedule, as well as at a special call from the customer or contractor in accordance with the contract (regulatory document).

4.7 The customer is obliged to provide specialists who carry out field supervision with equipped service premises, means of communication, transport, etc. in accordance with the contract.

5 The procedure for maintaining the author's supervision log

5.1 When carrying out field supervision of the construction of an object, a log of field supervision of construction ** (hereinafter referred to as the log) is regularly maintained, which is compiled by the designer and transferred to the customer. Forms for filling out the journal are given in Appendix A.

5.2 Keeping a journal can be carried out both for the construction site as a whole, and for its start-up complexes or individual buildings and structures.

5.3 Registration of the journal should be carried out in accordance with GOST 2.105. The journal must be numbered, laced, decorated with all signatures on the title page and sealed with the customer's seal. The magazine is transferred by the customer to the contractor and is located at the construction site until it is completed. The journal is filled in by the head or specialists exercising architectural supervision, the customer and an authorized person of the contractor.

After construction is completed, the contractor hands over the magazine to the customer.

5.4 Each visit to the construction site by specialists is recorded in a journal. The record of the work carried out on field supervision is certified by the signatures of the responsible representatives of the customer and the contractor. Recording is also carried out in the absence of comments.

5.5 Records and instructions of specialists are set out clearly, with the necessary references to the current building codes and regulations, state standards, technical specifications.

6 Basic rights and obligations of specialists exercising architectural supervision

6.1 Fundamental rights

6.1.1 Access to all construction sites under construction and places of construction and installation works.

6.1.2 Acquaintance with the necessary technical documentation related to the construction site.

6.1.3 Monitoring the implementation of the instructions entered in the log.

6.1.4 Making proposals to the bodies of the State Architectural and Construction Supervision and other bodies of architecture and urban planning to suspend, if necessary, construction and installation work performed with identified violations, and to take measures to prevent violation of copyright in a work of architecture in accordance with the law.

6.2 Key responsibilities

6.2.1 Selective verification of compliance of construction and installation works with working documentation and the requirements of building codes and regulations.

6.2.2 Selective control over the quality and compliance with the technology of production of works related to ensuring the reliability, strength, stability and durability of structures and installation of process and engineering equipment.

6.2.3 Timely resolution of issues related to the need to make changes to the working documentation in accordance with the requirements of GOST 21.101, and control of execution.

6.2.4 Facilitate the familiarization of workers involved in construction and installation work, and representatives of the customer with the design and working documentation.

6.2.5 Informing the customer about the untimely and poor-quality implementation of the instructions of the specialists who carry out architectural supervision in order to take prompt measures to eliminate the identified deviations from the working documentation and violations of the requirements of regulatory documents.

6.2.6 Participation:

in the examination of works hidden by the construction of subsequent structures, the quality of which determines the strength, stability, reliability and durability of the buildings and structures under construction;

in acceptance in the process of construction of individual critical structures.

6.2.7 Regular logging and performance of other works and services specified in the contract (regulatory document).

* The concept of "construction" includes new construction, expansion, reconstruction and technical re-equipment.

** The agreement may provide for a copy of the journal.

Annex A

(mandatory)

Forms for compiling and maintaining a journal of architectural supervision

Title page form*

β”‚ Name of the construction object ________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚ Construction address ____________________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚ Customer _________________________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚ (name, address) β”‚

β”‚ Designer _____________________________________________________β”‚

β”‚_______________________________________________________________________β”‚

β”‚ (name, address of the design organization β”‚

β”‚_______________________________________________________________________β”‚

β”‚ or project department) β”‚

β”‚Journal started __________________ Journal ended _______________β”‚

β”‚ (date) (date) β”‚

β”‚Head of MP designer ______________ β”‚

β”‚ (signature) β”‚

β”‚Head of the customer MP_______________β”‚

β”‚ (signature) β”‚

β””β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜

──────────────────────────────

* The format of the journal, including the title page, as a rule, is A 4.

Form of the list of contractors carrying out construction and installation work

Scroll
contractors performing construction and installation works

Performer of works (general contractor, contractor) _____________________

_________________________________________________________________________

Performers of certain types of work (subcontractors):

1._______________________________________________________________________

(name of work - construction and installation organization)

2. ______________________________________________________________________

3. ______________________________________________________________________

4. ______________________________________________________________________

5. ______________________________________________________________________

Form of the list of specialists exercising architectural supervision

List of specialists exercising architectural supervision

β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”

β”‚Surname, name, β”‚Project β”‚Type of work, by β”‚Date and N of the document aboutβ”‚

β”‚ patronymic β”‚ organization, β”‚ which exercise- β”‚ authority to conduct-β”‚

β”‚ β”‚N phone β”‚supervision β”‚ β”‚

β”‚ 1 β”‚ 2 β”‚ 3 β”‚ 4 β”‚

β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚

β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚

Registration form

Registration sheet
visits to the facility by specialists who carry out architectural supervision of construction

β”Œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”

β”‚Nameβ”‚Surname, name, β”‚ Date β”‚ Signature β”‚

β”‚organization β”‚patronymic β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€representative β”‚

β”‚ β”‚ β”‚ arrival β”‚ departure β”‚ customer β”‚

β”‚ 1 β”‚ 2 β”‚ 3 β”‚ 4 β”‚ 5 β”‚

β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”œβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

Account form

Record sheet N _

β”Œβ”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”¬β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”

β”‚Dateβ”‚Identified from-β”‚Indications aboutβ”‚Signature β”‚With a record β”‚Mark about β”‚

β”‚ β”‚derogations fromβ”‚elimination of β”‚specialist- β”‚familiarized β”‚execution β”‚

β”‚ β”‚ design estimates - β”‚ identified β”‚ that, implemented - β”‚ present - β”‚ instructions:

.

β”‚ β”‚requirements β”‚ny and termsβ”‚supervision, you-β”‚chika; β”‚b) customer β”‚

β”‚ β”‚construction β”‚their completed-β”‚completed β”‚b) order- β”‚(surname, β”‚

β”‚ β”‚ norms and rules and β”‚ niya β”‚ record (fa-β”‚ β”‚ β”‚ initials, β”‚

β”‚ β”‚technical us-β”‚ β”‚miley, ini-β”‚(surname, β”‚position, β”‚

β”‚ β”‚lovy by β”‚ β”‚cials, β”‚initials, β”‚date) β”‚

β”‚ β”‚ building leadership-β”‚ β”‚ position) β”‚ position, β”‚ β”‚

β”‚ β”‚installation- β”‚ β”‚ β”‚date) β”‚ β”‚

β”‚ β”‚ work β”‚ β”‚ β”‚ β”‚ β”‚

β”‚1 β”‚ 2 β”‚ 3 β”‚ 4 β”‚ 5 β”‚ 6 β”‚

β”œβ”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β”œβ”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”Όβ”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€

β”‚ β”‚ β”‚ β”‚ β”‚ β”‚ β”‚

β””β”€β”€β”€β”€β”΄β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”΄β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”΄β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”΄β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”΄β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”€β”˜


SP 11-110-99

UDC 721.021:658.012.7

CODE OF RULES FOR DESIGN AND CONSTRUCTION

THE SUPERVISION OF AUTHORS FOR CONSTRUCTION

OF BUILDINGS AND STRUCTURES

Introduction date 1999 -07-01

FOREWORD

1 DEVELOPED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia, the Russian Society of Civil Engineers (ROIS) and the State Enterprise - Center for Scientific and Methodological Support of Engineering Support for Investments in Construction (SE "CENTRINVESTproject") of the Gosstroy of Russia

2 REPRESENTED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

4 INSTEAD OF SNiP 1.06.05-85

INTRODUCTION

1 AREA OF USE

1.1 This document establishes the recommended provisions for the organization and maintenance of architectural supervision at construction sites *.

1.2 The document is intended to be used pdevelopers of project documentation (hereinafter referred to as designers), developers (hereinafter referred to as customers), construction and installation organizations, state supervision bodies, other legal entities and individuals (including foreign ones) - participants in the investment process during the construction of facilities.

1.3 The document is mandatory in the following cases:

performance of architectural supervision in accordance with this SP is providedagreed by an agreement between the customer and the designer or an administrative document (order) of the organization leading the design, investment and construction of the facility.

______________

* The concept of "construction" includes new construction, expansion, reconstruction and technical re-equipment.

This Code of Practice makes reference to the following standards:

GOST 2.105-95 ESKD. General requirements for text documents;

GOST 21.101-97 SPDS. Basic requirements for design and workher documentation.

3 DEFINITIONS

In this regulatory document, the following terms are used with their respective definitions.

3.1 Copyrightsupervision- one of the types of services for the supervision of the author of the project and other developers of project documentation (individuals and legal entities) for construction, carried out in order to ensure that the decisions contained in the working documentation comply with the construction and installation work performed at the facility. The need for architectural supervision is within the competence ofthe customer and, as a rule, is set in the assignment for the design of the facility.

3.2 Agreement- the main document regulating the relationship of the parties, establishing their rights and obligations for the implementation of architectural supervision in the contract method of organizing design. This agreement may provide for technical supervision.

3.3 Customer(developer) - a natural or legal person who organizes and finances the construction of an object.

3.4 Contractor- natural or legal person, Iwhich is the contractor of construction and installation works at the construction site.

3.5 Designer - an individual or legal entity that, as a rule, has developed working documentation for the construction of an object and carries out architectural supervision.

3.6 Regulatory document (order) - the main document for the implementation of architectural supervision in the design, investment and construction of an object by one organization.

4.1 Architectural supervision is carried out on the basis of an agreementordering document) and is carried out, as a rule, during the entire period of construction and commissioning of the facility, and, if necessary, the initial period of its operation.

4.2 The deadlines for carrying out works on architectural supervision are established by the schedule attached to the documents specified in 3.2 and 3.6.

4.3 Author's supervision in the case of its implementation by a legal entity is carried out by specialists - developers of working documentation, appointed by the management of the organization. Head of specialists, waspschestvuyuschie architectural supervision, is appointed, as a rule, the chief architect or chief engineer of the project.

4.4 The appointment of a manager and specialists responsible for carrying out architectural supervision is made by order of the organization and brought to the attention of the customer, who informs the contractor and the State Architectural and Construction Supervision authorities about the decision.

4.5 Designer supervision specialists go to the construction site for intermediate acceptance of critical structuresand examination of hidden work within the time frame provided for by the schedule, as well as on a special call from the customer or contractor in accordance with the contract (regulatory document).

4.6 The head of architectural supervision issues tasks to specialists and coordinates their work on conducting architectural supervision at the facility.

4.7 The customer is obliged to provide specialists who carry out architectural supervision with equipped office premises, means of communication, transport, etc. in accordance with the contract.

___________

* D the agreement may provide for a copy of the journal.

5.1 When exercising architectural supervision over the construction of an object, a journal of architectural supervision of construction * (hereinafter referred to as the journal) is regularly maintained, which is compiled by the designer and transferred to the customer. Forms for filling out the journal are given in Appendix A.

5.2 Logging can be carried out both for the construction site as a whole, and for its start-up complexes or individual buildings and constructed iyam.

5.3 The design of the journal should be carried out in accordance with GOST 2.105. The journal must benumbered, laced, decorated with all signatures on the title page and sealed with the customer's seal. The magazine is transferred by the customer to the contractor and is located at the construction site until it is completed. The journal is filled in by the head or specialists exercising architectural supervision, the customer and an authorized person of the contractor.

After construction is completed, the contractor hands over the magazine to the customer.

5.4 Each visit to the facilityinformation by specialists is recorded in the journal. The record of the work carried out on field supervision is certified by the signatures of the responsible representatives of the customer and the contractor. Recording is also carried out in the absence of comments.

5.5 Records and instructions of specialists are set out clearly, with the necessary references to the current building codes and regulations, state standards, technical specifications.

6 BASIC RIGHTS AND OBLIGATIONS OF SPECIALISTS,

6.1 Fundamental rights

6.1.1 Access to all construction objects under construction and places of construction and installation works.

6.1.2 Acquaintance with the necessary technical documentation related to the construction object.

6.1.3 Monitoring the implementation of the instructions entered in the log.

6.1.4 Making proposals to the bodies of the State Architectural and Construction Supervision and other bodies of architecture and urban planning on the suspension, if necessary, of construction and installation work performed with identified violations, and taking measureson the prevention of copyright infringement in a work of architecture in accordance with the law.

6.2 Key responsibilities

6.2.1 Selective verification of compliance of construction and installation works with working documentation and the requirements of building codes and regulations.

6.2.2 Selective control over the quality and compliance with the technology of production of works related to ensuring the reliability, strength, stability and durability of structures and installation of technological and engineering equipment.

6.2 .3 Timely resolution of issues related to the need to make changes to the working documentation in accordance with the requirements of GOST 21.101, and control over execution.

6.2.4 Facilitating the familiarization of workers involved in construction and installation work, and representatives of the customer with design and working documentation.

6.2.5 Informing the customer about the untimely and poor-quality implementation of the instructions of the specialists in charge of architectural supervision in order to take prompt measures to eliminate the identified problemsdeviations from the working documentation and violations of the requirements of regulatory documents.

6.2.6 Participation:

in the examination of works hidden by the construction of subsequent structures, the quality of which determines strength and stability. reliability and durability of buildings and structures under construction;

in acceptance in the process of construction of individual critical structures.

6.2.7 Regular logging and performance of other works and services specified in the contract (mandatory document).

APPENDIX A

(mandatory)

FD WPMS FOR COMPILING AND KEEPING THE AUTHOR'S SUPERVISION JOURNAL

Title page form*

Name of the construction object ____________________________________________

_______________________________________________________________________________

_______________________________________________________________________________

Construction address __________________________________________ ________________

_______________________________________________________________________________

_______________________________________________________________________________

Customer ________________________________________________________________________

_______________________________________________________________________________

(name, address)

_______________________________________________________________________________

Designer ____________________________________________________________ __

_______________________________________________________________________________

(name, address of the design organization or design unit)

_______________________________________________________________________________

Journal started ____________________ Journal completed ___________________

(date) (date)

Head of MP designer __ ____________________________

(signature)

Head of the customer MP ______________________________

(signature)

______________

* The format of the journal, including the title page, as a rule, is A 4.

Appendix A continued

List form in a row organizations,

carrying out construction and installation works

LIST OF CONTRACTORS,

PERFORMING CONSTRUCTION AND INSTALLATION WORKS

Performer of works (general contractor, contractor) ______________________________

_______________________________________________________________________________

_______________________________________________________________________________

Performers of certain types of work (subcontractors):

1. __________________________________________________________________ ___________

(name of work - construction and installation organization)

2. _____________________________________________________________________________

3. _____________________________________________________________________________

4. _____________________________________________________________________________

5. _____________________________________________________________________________

Form of the list of specialists exercising architectural supervision

LIST OF SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION

Fami liya, name, patronymic

Design organization, position, phone number

Type of work for which architectural supervision is carried out

Date and number of the document on the authority to conduct architectural supervision

Appendix A continued

Registration form

REGISTRATION SHEET OF THE SITE VISIT BY SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION OF THE CONSTRUCTION

Name of company

Full Name

date

Representative signature

arrival

departure

customer

Account form

RECORD SHEET No. ___

date

Identified deviations from the design and estimate documentation, violations of the requirements of building codes and regulations and technical conditions for the production of construction and installation works

Instructions on the elimination of identified deviations or violations and the timing of their implementation

Signature of the specialist in charge of architectural supervision who made the entry (surname, initials, position)

Representative familiarized with the record:

a) a contractor;

b) customer (surname, initials, position, date)

A note on the implementation of instructions: a) contractor;

b) customer (surname, initials, position, date)

Introduction

1 area of ​​use

3. Definitions

6. Basic rights and obligations of specialists exercising architectural supervision

Appendix A Forms for compiling and maintaining a journal of architectural supervision

USE DISCLAIMER
The text is provided for reference and may not be relevant.
The printed edition is fully updated to the current date

The system of regulatory documents in construction

SET OF RULES
FOR DESIGN AND CONSTRUCTION

SP 11-110-99

STATE COMMITTEE OF THE RUSSIAN FEDERATION ON CONSTRUCTION AND HOUSING AND UTILITY COMPLEX
(GOSSTROY OF RUSSIA)

Moscow

1999

FOREWORD

1 DEVELOPED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia, the Russian Society of Civil Engineers (ROIS) and the State Enterprise Center for Scientific and Methodological Support of Engineering Support for Investments in Construction (SE "CENTRINVESTproject") of the Gosstroy of Russia

2 REPRESENTED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

4 INSTEAD OF SNiP 1.06.05-85

INTRODUCTION

SP 11-110-99

CODE OF RULES FOR DESIGN AND CONSTRUCTION

THE SUPERVISION OF AUTHORS FOR CONSTRUCTION OF BUILDINGS AND STRUCTURES

Introduction date 1999-07-01

1 AREA OF USE

1.1 This document establishes the recommended provisions for organizing and maintaining field supervision at construction sites*.

______________

* The concept of "construction" includes new construction, expansion, reconstruction and technical re-equipment.

1.2 The document is intended for use by developers of project documentation (hereinafter referred to as designers), developers (hereinafter referred to as customers), construction and installation organizations, state supervision bodies, other legal entities and individuals (including foreign ones) - participants in the investment process during the construction of facilities.

1.3 The document is mandatory in the following cases:

the implementation of field supervision in accordance with this joint venture is provided for by an agreement between the customer and the designer or an administrative document (order) of the organization that designs, invests and builds the facility.

2 REGULATORY REFERENCES

This Code of Practice makes reference to the following standards:

GOST 2.105-95 ESKD. General requirements for text documents;

GOST 21.101-97 SPDS. Basic requirements for design and working documentation.

3 DEFINITIONS

In this regulatory document, the following terms are used with their respective definitions.

3.1 Author's supervision- one of the types of services for the supervision of the author of the project and other developers of project documentation (individuals and legal entities) for construction, carried out in order to ensure the compliance of the decisions contained in the working documentation with the construction and installation work performed at the facility. The need for architectural supervision is within the competence of the customer and, as a rule, is established in the assignment for the design of the object.

4.3 Author's supervision in the case of its implementation by a legal entity is carried out by specialists - developers of working documentation, appointed by the management of the organization. As a rule, the chief architect or chief engineer of the project is appointed as the head of the specialists exercising architectural supervision.

4.4 The appointment of a manager and specialists responsible for carrying out architectural supervision is made by order of the organization and brought to the attention of the customer, who informs the contractor and the State Architectural and Construction Supervision authorities about the decision.

4.5 Specialists who carry out architectural supervision go to the construction site for intermediate acceptance of critical structures and examination of hidden work within the time frame stipulated by the schedule, as well as on a special call from the customer or contractor in accordance with the contract (regulatory document).

4.6 The head of architectural supervision issues tasks to specialists and coordinates their work on conducting architectural supervision at the facility.

4.7 The customer is obliged to provide specialists who carry out architectural supervision with equipped office premises, means of communication, transport, etc. in accordance with the contract.

5 PROCEDURE FOR KEEPING THE AUTHOR'S SUPERVISION JOURNAL

5.1 When exercising architectural supervision over the construction of an object, a journal of architectural supervision of construction * (hereinafter referred to as the journal) is regularly maintained, which is compiled by the designer and transferred to the customer. Forms for filling out the journal are given in the appendix.

_______________

* The agreement may provide for a copy of the journal.

5.2 Logging can be carried out both for the construction site as a whole, and for its start-up complexes or individual buildings and structures.

5.3 The design of the journal should be carried out in accordance with GOST 2.105. The journal must be numbered, laced, decorated with all signatures on the title page and sealed with the customer's seal. The magazine is transferred by the customer to the contractor and is located at the construction site until it is completed. The journal is filled in by the head or specialists exercising architectural supervision, the customer and an authorized person of the contractor.

After construction is completed, the contractor hands over the magazine to the customer.

5.4 Each visit to the construction site by specialists is recorded in the journal. The record of the work carried out on field supervision is certified by the signatures of the responsible representatives of the customer and the contractor. Recording is also carried out in the absence of comments.

5.5 Records and instructions of specialists are set out clearly, with the necessary references to the current building codes and regulations, state standards, technical specifications.

6 BASIC RIGHTS AND OBLIGATIONS OF SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION

6.1 Fundamental rights

6.1.1 Access to all construction sites under construction and places of construction and installation works.

6.1.2 Acquaintance with the necessary technical documentation related to the construction object.

6.1.3 Monitoring the implementation of the instructions entered in the log.

6.1.4 Making proposals to the bodies of the State Architectural and Construction Supervision and other bodies of architecture and urban planning to suspend, if necessary, construction and installation work performed with identified violations, and to take measures to prevent violation of copyright in a work of architecture in accordance with the law.

6.2 Key responsibilities

6.2.1 Selective verification of compliance of construction and installation works with working documentation and the requirements of building codes and regulations.

6.2.2 Selective control over the quality and compliance with the technology of production of works related to ensuring the reliability, strength, stability and durability of structures and installation of technological and engineering equipment.

6.2.3 Timely resolution of issues related to the need to make changes to the working documentation in accordance with the requirements of GOST 21.101, and control over execution.

6.2.4 Facilitating the familiarization of workers involved in construction and installation work, and representatives of the customer with design and working documentation.

6.2.5 Informing the customer about the untimely and poor-quality implementation of the instructions of the specialists who carry out architectural supervision, in order to take prompt measures to eliminate the identified deviations from the working documentation and violations of the requirements of regulatory documents.

6.2.6 Participation:

in the examination of works hidden by the construction of subsequent structures, the quality of which determines the strength, stability, reliability and durability of the buildings and structures under construction;

in acceptance in the process of construction of individual critical structures.

6.2.7 Regular logging and performance of other works and services specified in the contract (mandatory document).

The system of regulatory documents in construction

SET OF RULES
FOR DESIGN AND CONSTRUCTION

SP 11-110-99

STATE COMMITTEE OF THE RUSSIAN FEDERATION ON CONSTRUCTION AND HOUSING AND UTILITY COMPLEX
(GOSSTROY OF RUSSIA)

Moscow

FOREWORD

1 DEVELOPED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia, the Russian Society of Civil Engineers (ROIS) and the State Enterprise Center for Scientific and Methodological Support of Engineering Support for Investments in Construction (SE "CENTRINVESTproject") of the Gosstroy of Russia

2 REPRESENTED by the Department of Scientific and Technical Policy and Design and Survey Works of the Gosstroy of Russia

4 INSTEAD OF SNiP 1.06.05-85

INTRODUCTION

CODE OF RULES FOR DESIGN AND CONSTRUCTION

THE SUPERVISION OF AUTHORS FOR CONSTRUCTION OF BUILDINGS AND STRUCTURES

Introduction date 1999-07-01

1 AREA OF USE

1.1 This document establishes the recommended provisions for organizing and maintaining field supervision at construction sites*.

* The concept of "construction" includes new construction, expansion, reconstruction and technical re-equipment.

1.2 The document is intended for use by developers of project documentation (hereinafter referred to as designers), developers (hereinafter referred to as customers), construction and installation organizations, state supervision bodies, other legal entities and individuals (including foreign ones) - participants in the investment process during the construction of facilities.

1.3 The document is mandatory in the following cases:

the implementation of field supervision in accordance with this joint venture is provided for by an agreement between the customer and the designer or an administrative document (order) of the organization that designs, invests and builds the facility.

2 REGULATORY REFERENCES

GOST 2.105-95 ESKD. General requirements for text documents;

GOST 21.101-97 SPDS. Basic requirements for design and working documentation.

3 DEFINITIONS

In this regulatory document, the following terms are used with their respective definitions.

3.1 Author's supervision- one of the types of services for the supervision of the author of the project and other developers of project documentation (individuals and legal entities) for construction, carried out in order to ensure the compliance of the decisions contained in the working documentation with the construction and installation work performed at the facility. The need for architectural supervision is within the competence of the customer and, as a rule, is established in the assignment for the design of the object.

3.2 Treaty- the main document regulating the relationship of the parties, establishing their rights and obligations for the implementation of architectural supervision in the contract method of organizing design. This agreement may provide for technical supervision.

3.3 Customer(developer) - a natural or legal person who organizes and finances the construction of an object.

3.4 Contractor- an individual or legal entity that is the executor of construction and installation works at the construction site.

3.5 Designer- an individual or legal entity that, as a rule, has developed working documentation for the construction of an object and carries out architectural supervision.

3.6 Administrative document(order) - the main document for the implementation of architectural supervision in the design, investment and construction of an object by one organization.

4 ORGANIZATION OF AUTHOR'S SUPERVISION

4.1 Architectural supervision is carried out on the basis of an agreement (regulatory document) and is provided, as a rule, during the entire period of construction and commissioning of the facility, and, if necessary, the initial period of its operation.

4.3 Author's supervision in the case of its implementation by a legal entity is carried out by specialists - developers of working documentation, appointed by the management of the organization. As a rule, the chief architect or chief engineer of the project is appointed as the head of the specialists exercising architectural supervision.

4.4 The appointment of a manager and specialists responsible for carrying out architectural supervision is made by order of the organization and brought to the attention of the customer, who informs the contractor and the State Architectural and Construction Supervision authorities about the decision.

4.5 Specialists who carry out architectural supervision go to the construction site for intermediate acceptance of critical structures and examination of hidden work within the time frame stipulated by the schedule, as well as at the special call of the customer or contractor in accordance with the contract (regulatory document).

4.7 The customer is obliged to provide specialists who carry out architectural supervision with equipped office premises, means of communication, transport, etc. in accordance with the contract.

5 PROCEDURE FOR KEEPING THE AUTHOR'S SUPERVISION JOURNAL

5.1 When exercising architectural supervision over the construction of an object, a journal of architectural supervision of construction * (hereinafter referred to as the journal) is regularly maintained, which is compiled by the designer and transferred to the customer. Forms for filling out the journal are given in Appendix A.

* The agreement may provide for a copy of the journal.

5.2 Logging can be carried out both for the construction site as a whole, and for its start-up complexes or individual buildings and structures.

5.3 The design of the journal should be carried out in accordance with GOST 2.105. The journal must be numbered, laced, decorated with all signatures on the title page and sealed with the customer's seal. The magazine is transferred by the customer to the contractor and is located at the construction site until it is completed. The journal is filled in by the head or specialists exercising architectural supervision, the customer and an authorized person of the contractor.

5.4 Each visit to the construction site by specialists is recorded in the journal. The record of the work carried out on field supervision is certified by the signatures of the responsible representatives of the customer and the contractor. Recording is also carried out in the absence of comments.

5.5 Records and instructions of specialists are set out clearly, with the necessary references to the current building codes and regulations, state standards, technical specifications.

6 BASIC RIGHTS AND OBLIGATIONS OF SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION

6.1 Fundamental rights

6.1.1 Access to all construction sites under construction and places of construction and installation works.

6.1.2 Acquaintance with the necessary technical documentation related to the construction object.

6.1.3 Monitoring the implementation of the instructions entered in the log.

6.1.4 Making proposals to the bodies of the State Architectural and Construction Supervision and other bodies of architecture and urban planning to suspend, if necessary, construction and installation work performed with identified violations, and to take measures to prevent violation of copyright in a work of architecture in accordance with the law.

6.2 Key responsibilities

6.2.1 Selective verification of compliance of construction and installation works with working documentation and the requirements of building codes and regulations.

6.2.2 Selective control over the quality and compliance with the technology of production of works related to ensuring the reliability, strength, stability and durability of structures and installation of technological and engineering equipment.

6.2.3 Timely resolution of issues related to the need to make changes to the working documentation in accordance with the requirements of GOST R 21.101, and control over execution.

6.2.4 Facilitating the familiarization of workers involved in construction and installation work, and representatives of the customer with design and working documentation.

6.2.5 Informing the customer about the untimely and poor-quality implementation of the instructions of the specialists who carry out architectural supervision, in order to take prompt measures to eliminate the identified deviations from the working documentation and violations of the requirements of regulatory documents.

6.2.6 Participation:

in the examination of works hidden by the construction of subsequent structures, the quality of which determines the strength, stability, reliability and durability of the buildings and structures under construction;

in acceptance in the process of construction of individual critical structures.

6.2.7 Regular logging and performance of other works and services specified in the contract (mandatory document).

APPENDIX A

(mandatory)

FORMS FOR COMPILING AND KEEPING THE AUTHOR'S SUPERVISION JOURNAL

Title page form*

Name of the construction object ______________________________________

__________________________________________________________________________

__________________________________________________________________________

Construction address _____________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Customer _______________________________________________________________

__________________________________________________________________________

(name, address)

__________________________________________________________________________

Designer _____________________________________________________________

__________________________________________________________________________

(name, address of the design organization or design unit)

Journal started _____________________

(date)

The journal is over ___________________

(date)

Head of designer

MP _____________________

(signature)

Customer manager

MP _____________________

(signature)

* The format of the magazine, including the title page, as a rule, is A4.

Form of the list of contractors carrying out construction and installation work

LIST OF CONTRACTORS CARRYING OUT CONSTRUCTION AND INSTALLATION WORKS

Performer of works (general contractor, contractor) _______________________

___________________________________________________________________________

___________________________________________________________________________

Performers of certain types of work (subcontractors):

1. _______________________________________________________________________

(name of work - construction and installation organization)

2. _______________________________________________________________________

3. _______________________________________________________________________

4. _______________________________________________________________________

5. _______________________________________________________________________

Form of the list of specialists exercising architectural supervision

Registration form

REGISTRATION SHEET OF THE SITE VISIT BY SPECIALISTS CARRYING OUT AUTHOR'S SUPERVISION OF THE CONSTRUCTION

Name of company

Full Name

Signature of the customer's representative

Account Form

RECORD SHEET No. ___

Identified deviations from the design and estimate documentation, violations of the requirements of building codes and regulations and technical conditions for the production of construction and installation works

Instructions on the elimination of identified deviations or violations and the timing of their implementation

Representative familiarized with the record:

a) a contractor;

b) customer

Follow-up mark:

a) a contractor;

b) customer

(surname, initials, position, date)