Defective act for the repair of premises: an example

The defective act, in view of the specifics and circumstances of its preparation, is referred to as accounting form documents reflecting all defects found during the inspection of the object, as well as the recommendations established by the commission at the end, aimed at eliminating them.

It is required to draw up such documents during the inspection of various construction projects in order to identify shortcomings made during the performance of certain works.

The executed acts contain a table in their structure, where, subsequently, a list of works is indicated, the implementation of which is necessary to eliminate the detected defects.

These works are designated without fixing price indicators of a certain volume (if the latter were available, one could consider the drawn up act as a kind of estimate, this is the difference between these documents).

Organizations have the opportunity to use separately developed forms of defective acts.

The latter must contain the following information:

  • The name of the object in respect of which the check was carried out in order to identify possible defects;
  • List of representatives (specialists) whose candidacies were approved for participation in the survey process and drawing up the act;
  • List of defects found during the inspection of the object;
  • Recommendations determined by the decision of the commission in order to eliminate the detected defects.

If the conversation turns to an inspection of an object completed by the construction of an object, in this case, the appointed commission is obliged to inspect each structural element of the object (the walls of the building being inspected, its roof structure, flooring, window and door structures, etc.).

Each of the objects, from the moment of its inspection, is indicated separately in the table. A specific percentage of the physical deterioration of the object is immediately given and all the necessary types of work aimed at the complete elimination of the identified defects are signed.

Based on the defective act drawn up by the commission, the latter makes an informed decision on the need for repair work in relation to the object in order to correct the detected defects.

Here we can talk about both a regular restoration repair and a complete overhaul.

All problems and shortcomings identified at the facility that require their immediate elimination are entered in the document table. Subsequently, the defective act is used as the basis for the budget.

Dear readers! Our articles talk about typical ways to resolve legal issues, but each case is unique.

If you want to know how to solve exactly your problem - contact the online consultant form on the right. It's fast and free! Or call us at phones:

+7 (499) 703-47-59
Moscow, Moscow region

+7 (812) 309-16-93
St. Petersburg, Leningrad region

8 (800) 511-69-42
Federal number ( the call is free for all regions of Russia)!

APPROVE

Head of the organization

Fedorov Valery Sergeevich

DEFECTIVE ACT No. 47

for repair work

Limited Liability Company "Construction Complex"

Object: two-story building located on the street. Severnaya, Yekaterinburg

Commission consisting of:

chairman of the commission Chief Engineer of Construction Complex LLC Malyshev G.V.
committee members: Foreman Saveliev I.M.

Site engineer Vladimirov S.A.

(full name, position, place of work)
made an inspection Two-storey building (non-residential)
(name of the object, etc.)
No. p / p Unit rev. Volumes
1ST FLOOR
1. Part of the tiling in the lobby is missing M 2 10
2. There are no partitions between adjacent rooms No. 3, No. 7, and No. 5 and No. 8 Brick partition walls M 2 20
1. Installation of coatings on cement mortar from tiles

Brick partition walls

M 2 10
2 FLOOR
1. Door upholstery not done Door upholstery on felt on both sides PC 3
2. There are no platbands Installation and fastening of platbands PC 10
1. Door upholstery on felt on both sides

2. Installation and fastening of platbands

3
1. Installation of coatings on cement mortar from tiles

2. Laying brick partitions

3. Door upholstery on felt on both sides

4.Installation and fastening of platbands

10

Commission Chairman

Chief Engineer LLC

Malysheva G.V.

(job title) (signature) (full name)
Commission members: Foreman

Saveliev I.M.

(job title) (signature) (full name)
Site engineer Vladimirova S.A.
(job title) (signature) (full name)

Defective act for the repair of premises: form

APPROVE

Head of the organization

__________ ________________

(signature) (signature transcript)

"___" ___________________ 201_

DEFECTIVE ACT No. _____

for repair work

Name of company_________________________

An object:_________________________

No. p / p List of defects indicating the premises (object) Types of work required (formulations from price books are used) Unit rev. Volumes
1ST FLOOR
Total for the 1st floor by type and scope of work
2 FLOOR
Total for the 2nd floor by type and scope of work
Total for all types and volumes of work


Defective current repair report

DEFECTIVE ACT№____

Place of compilation
Based on an order for N
(name of company)
commission consisting of:
chairman of the commission
(full name, position, place of work)
committee members:
(full name, position, place of work)
made an inspection
(name of fixed assets, brand, model, inventory number, etc.)
and established the fact of the presence of the following defects (damage, malfunctions, etc.):