Basic prices for design work for construction. Basic prices for project work for the construction of explanations on the application of LCS for design work

Introduction
I explanations for the definition of the basic price of design work for the construction of housing and civil facilities
1 How to determine the costs of designing individual heat points (including and built-in) with a capacity of 0.8-1.5 Gcal / hour?
2 Did the base price of the kindergarten design, the cost of designing the laundry, food, germination?
3 How to calculate the cost of work on the fence of a residential complex?
4 How to calculate the cost of binding the elevator project for the hospital?
5 How to determine the cost of designing the ski slopes, lifts and veneers?
II standards for the preparation of technical documentation for the overhaul of buildings and housing structures
1 It is covered by the Regulation on the composition of the sections of the project documentation and the requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87 (Regulation), for the LCG "Regulations for the preparation of technical documentation for the overhaul of buildings and housing structures at 12.03. 2012 (SBCP 81-2001-05)
2 What include work on the preparation of technical documentation for the overhaul of facades of buildings and structures?
3 How to determine the cost of preparing technical documentation for the overhaul of balconies?
4 How to determine the cost of developing interiors in the overhaul of buildings and structures?
5 How to calculate the cost of capital repairs of a cafe for 100 seats?
6 How to determine the cost of overhaul of boiler rooms?
III Territorial Planning and Territory Planning
1 Is the price of lowering coefficients (0.4 and 0.6) in the SBTP 81-2001-01 "Territorial planning and planning of the territory" editorial. 2010?
2 What works include projects of planning territories and survey?
3 How to calculate the cost of implementing the planning organization of the land plot of the neighborhood?
4 How to calculate the cost of developing a project of building municipalities?
IV Communication Objects
1 How to determine the cost of designing security systems - television protection and observation system (Tson)?
2 Which tables of the recommended relative value of the development of sections of the design and working documentation of buildings and structures are applied to station structures (2 OS) SBCP 81-2001-02?
V Water supply and sewerage objects
1 What of the directories need to be guided by determining the cost of the sewer collector with a diameter of 1400 mm and a length of more than 5 km in an urban feature?
2 How to determine the cost of designing water letta structures?
3 How to determine the cost of designing wastewater pumping stations with a capacity of 0.0065 thousand m3 / hour?
4 How to determine the cost of designing a low-length drainage?
VI General Freeding Roads
1 How to determine the cost of the protection of existing engineering communications?
2 How to calculate the cost of developing project documentation for cash pockets for roads (for stopping sites)?
VII Communal Engineering Networks and Constructions
1 To which design objects include Tables No. 48 and 49 GSN "Directory of basic prices for project work in the construction of" Communal engineering networks and structures "(ICSP 81-2001-07), containing indicators of the recommended indicative relative cost of developing partitions of project working documentation?
2 What energy supply facilities included in the Basic price guide for design work in the construction of "Communal engineering networks and structures" ed. 2012 (ICSP 81-2001-07) belong to linear?
3 How to determine the cost of designing relay protection using integrated circuits?
4 How to determine the cost of designing lightning protection cables for the organization of high-quality communication as well as a fiber-optic communication line (Vols)?
5 How to determine the cost of designing the architectural illumination of the facade of the building?
6 How to determine the costs associated with the participation of the project organization on behalf of the Customer in the choice of the site (routes) for construction?
7 How to determine the cost of designing the airline (VL) with the presence of plots of 3 categories of complexity in CBP 81-2001-07 "Communal engineering networks and structures"?
8 How to determine the cost of designing electrical networks and electrical calculations?
9 Are the branch line to consumers (from the highway to the consumer) to consumers (from the highway to the consumer) in SBCP 81-2001-07?
10 How to determine the cost of designing air lines with a voltage of 0.4 kV and length of up to 1 km and less?
11 On the design conditions of power electrical cables up to 35 kV and the composition of the prepared project documentation
12 How to determine the cost of designing plumbing networks of one diameter and destination, but passing along different routes?
VIII Hunting Constructions and Designs, Water Rocking, Anti-Large Constructions and Events, Pile Foundations
1 In which cases, the coefficient to seismicity is applied on the reference book of basic prices for design work for construction "Blowed structures and structures, water supply, anti-rolled structures and events, pile foundations" ed. 2004?
IX clarification to determine the cost of performing other design or related work design
1 How does the tax take into account in the simplified tax system in the calculation of the value of the project work on the reference books of basic prices?
2 How is the basic price of design work calculated in the case when the design of the design object is greater than the double maximum indicator?
3 How to determine the cost of recruiting an object with additional equipment to ensure its uninterrupted power supply?
4 How to determine the cost of drawing up the instruction manual for the object of capital construction?
5 How to calculate fire risks? What percentage of the cost in the section "Fire safety" they make up?
6 It is covered by a provision on the composition of the sections of the project documentation and the requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87 (Regulation), for the LCG "Regulations for the preparation of technical documentation for the overhaul of buildings and structures of housing and civilian purposes" Approved Ministry of Regional Development of Russia Order No. 96 of 12.03.2012 (ICSP 81-2001-05)?
7 How to calculate the costs of major performers in accordance with MDS 81.35-2004?
8 When determining the cost of designing from the cost of construction, an analogue object is used. The cost of an analog object is defined taking into account the district coefficient. When determining the cost of designing, is it legitimately a project organization to apply the district coefficient to the salary of employees, if the cost of which the cost of design is taken, it already takes into account it?
9 How to determine the cost of exercising author's oversight for construction?
10 How to determine the cost of environmental impact assessment (EIA)?
11 How to determine the cost of pre-project development?
12 How to determine the cost of performing project work on demolition or dismantling objects and structures?
13 What is included in section 12 "other documentation" of provisions on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of 02/16/2008 No. 87?
14 What is the basis in compiling a consolidated estimated calculation of the cost of construction?
15 What reduction coefficients should be administered in the calculation formula for the expenditure of construction and installation work in the total construction cost of less than 60% (for example, 18% and 28%)?
Applications
1 Indices to the prices for project work with the IU quarter of 1993 to the fourth quarter of 2013 (List)
2 Letter of the Ministry of Regional Development of the Russian Federation 12.11.2013 2133 1-cd / 10 on indexes of changes in the estimated cost of construction and installation work, on indices change the estimated value of design and survey work, indexes of changes in the estimated cost of other works and costs, as well as indexes on IV Quarter 2013 Changes in the estimated cost of technological equipment

Introduction

This collection of explanations for the application of the collection of prices and reference books of basic prices for design work for construction * (Questions and Answers) 2012 - 2017 (hereinafter - the collection) is an updated editorial board "Collection of explanations for the application of a collection of prices and reference books of basic prices for project work in construction ( Questions and Answers) "Developed by the Center in 2012 (hereinafter referred to as the 2012 collection), and refers to benefits designed to facilitate the activities of designers in solving them of certain specific, most pressing pricing issues and the estimated rationing of design work.

Clarifications included in the collection may also be useful for developers (customers), construction contractors in solving similar tasks, for example, when forming an initial (maximum) price for project work for the construction of facilities.

The actualization of the collection developed by the Center in 2012 is related to the need to bring the answers to the answers to the questions presented in it, which remained its significance today, the current legislative and regulatory framework, in which there are changes and additions that occurred from 2012 to present.

The issue of estimating the cost of performing design work and other engineering services related to investment activities in construction has always been of great importance for participants in the investment process, since its optimal solution ensures the effectiveness of production and financial activities as customers-developers and project documentation contractors.

In accordance with Article 30 of the Regulations on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87 (hereinafter referred to as the Regulation): "Estimated documentation for the construction of capital construction facilities, funded in whole or in part with The federal budget funds are drawn up using the estimated standards included in the federal register of estimated standards to be applied in determining the estimated value of capital construction objects, the construction of which is funded by the federal budget. "

The current market relations in the field of economic activity, including in the field of design, determine the formation of free (contractual) prices. In this case, all valid price indicators of the cost of design work are advisory reference documents used in determining the basic design price. For capital construction objects, the construction of which is funded in whole or in part with the attracting funds of the federal budget, existing estimated standards for the cost of design work, entered into the federal registry, are mandatory for use.

Explanations included in the collection are based on the legislative and regulatory framework for April 1, 2017 are not a regulatory document and express the point of view of the specialists of the Center (developers of estimated standards for project work) on the basis of an analysis of the current regulatory and regulatory and technical base. In this area.

Currently, the basic price of design work for the construction of objects is determined by:

Current sectoral and specialized sections of a collection of prices for project work for construction with changes and additions to them of the edition of 1987 - 90. (SC);

Directories of basic prices for project work for the construction of edition 1995 - 2008. (ICC).

Directories of basic prices for project work in the construction of the Edition 2010 - 2016. (ICSP).

The list of existing price documents as of April 1, 2017, entered into the federal registry, as well as the abbreviated name of all current reference books, are given to the present collection.

Taking into account the simultaneous action of the above estimated standards developed for use in various economic systems, the possibility of a reliable and adequate assessment of the cost of project work is associated with a large number of issues on the application of price documents in the field of design.

In this collection, compiled in the form of questions and answers, are given recommendations for determining the cost of work related to design for the construction of enterprises, buildings, structures of various sectoral purposes, most common in the practice of calculating the basic prices and formations based on their contractual prices for these works. , taking into account changes in legislative, legal and regulatory documents from 2012 to the present.

This collection is a continuation of the materials on the use of SC, the ICC and the SBCP, published in "compilation of explanations on the use of a collection of prices and reference books of basic prices for project work for construction (questions and answers)" 2002-2016; 2004-2016; 2005-2016; 2006-2017; 2007-2017; 2008-2017; 2009-2017 and 2010-2017

List of abbreviations used in the collection

Ap - Architectural and Planning Task
Inflation indexes - Indices change the cost of design work due to inflationary processes, published quarterly by the Ministry of Internal Affairs of Russia.
IM HM - Civil Defense and Prevention Activities and Emergency Prevention Events and Technogenic Character
MU-2009. - Methodical instructions on the application of reference books of basic prices for project work in construction, approved by the Order of the Ministry of Regional Development of the Russian Federation of December 29, 2009 No. 620 and registered by the Ministry of Justice of the Russian Federation 23.03.2010 No. 16686.
MU 2015. - Methodical instructions on the procedure for the development of state estimated standards "Reference books of basic prices for project work in construction", approved by the order of the Ministry of Construction of Russia 04.06.2015 No. 406 /
PD - Project documentation
Position - Regulations on the composition of the partitions of project documentation and requirements for their content; Approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87 (with changes and additions).
Working drawings AU, km and kzh - brands of the main sets of workers' drawings "Architectural and construction solutions", "Metal structures", "Constructions of reinforced concrete"
RD - Working documentation
Collection-2012. - Collection of explanations for the application of a collection of prices and reference books of basic prices for project work in construction (Question and Answers) - JSC "Centrinvestproekt", M., 2012.
Collection 2012 -2017 - Collection of explanations for the application of a collection of prices and reference books of basic prices for project work for construction * (Questions and Answers) - JSC "Centrinvestproekt", M., 2012 - 2017.
STC - Basic price reference books for the construction of editions 1995-1999, 2003, 2004, 2006-2008. Reducing the names of the LC is given to the present collection.
SBTP - Reference books of basic prices for project work in the construction of the Edition 2010-2016. Reducing the names of the SBCP is given to the present collection.
Directories - SC, ICC, ICSP.
Sch - Collection of prices for project work for the construction of a publication 1987-1990. Reducing the names of the SC sections are given in Appendix 1 to this collection.
Federal registry - The federal register of estimated standards to be applied in determining the estimated cost of capital construction facilities, the construction of which is funded with the involvement of funds for the federal budget.

I. Explaining to determine the basic price of design work for the construction of housing and civil facilities

1 How to determine the cost of developing project documentation of a 17-storey monolithic residential building (three block sections, incl. Two - individual and one - mirror) with the use of a block-section method?

The cost of developing project documentation using a block-section method of a 17-storey monolithic residential house consisting of 3 block sections is determined in the manner prescribed by clause 2.1.3 of chapters 2.1 "Residential buildings, hotels, hostels" Basic prices for Design works in the construction of "housing and civil construction facilities" Edition 2010 (ICCP 81-2001-03) and amounts to:

[(1662,038 + 0.118x56555,10) x (0.2 + 0.8x (18719.37 / 56555.1x1 + 19002,59 / 56555,59 / 56555,53 + 1883 3,14 / 56555,1х0.35)] x0 , 4x3,31 \u003d 9120.36 thousand rubles., Where

1662,038 and 0.118 - permanent values \u200b\u200bof the base price (clause 9 Table. 1 SBCP 81-02-03-2001);

56555.1 - the total building volume of the building;

18719.37 - the volume of the ordinary block section;

19002.59 - the volume of the end block section;

18833,14 - the volume of the end block section in the mirror design;

0.35 - the coefficient to "binding", taking into account the complexity of work due to changes in the presence of a mirror image of the end block section;

0.4 - share of the development of project documentation in a common base price;

3.31 - index of changes in the estimated cost of design work in accordance with the letter of the Ministry of Regional Development of Russia of 07.11.2011 No. 30394-IP / 08.

If it is necessary to bind as reused project documentation developed for the first 17-storey monolithic residential building, for two other 17-storey residential buildings, the calculation can be carried out according to the formula:

Thousand rub., where - the coefficient to "binding", established by paragraph 2.1.2 of chapters 2.1 SBCP 81-2001-03.

A fundamental methodological approach to the calculation of the design price of a 17-storey monolithic residential building (three block sections, incl. Two - individual and one - mirror) with the application of the block-section method given in the question 1 of section I collection 2012 , relevant and currently not subject to adjustment.

2 In the designed residential building on the design of the design of the electroplating is scheduled. Is the percentage allocated to the section "Gas supply" (2%) transfer to the "Power Supply" section on the Table of Relative Cost (No. 41)?

In accordance with paragraph 1.8 of the section I of methodical instructions on the application of reference books of basic prices for project work in construction ed. 2010 It should be borne in mind that the reference books present the recommended indicators of the relative cost of developing partitions of project and working documentation, which can be specified for the divisions of the project organization when designing a specific object within a certain total design cost, depending on the complexity of the work performed. Thus, the indicator of the relative value of the development of the section "Electricity" can be increased by 2%.

The answer to the update

A fundamental methodological approach to the calculation of the design price given to Question 2 of Section I collection 2012, relevant and currently not subject to adjustment.

3 How to determine when designing glazing balconies and loggia costs for designing (selection) profiles for their manufacture on a specialized enterprise?

The answer presented in the 2012 collection

When designing glazing balconies and loggias design (selection) of profiles for their manufacture on a specialized enterprise, like drawings of window blocks, are carried out by the manufacturer (or on its order a project organization), the cost of the design work does not include and are determined additionally on the basis of Cost calculation by estimated F. 3P.

The answer to the update

A fundamental methodological approach to the calculation of the design price given to Question 3 of Section I collection 2012, relevant and currently not subject to adjustment.

4 How to determine the price of designing the theater for 40 seats, 260 seats and 3000 seats?

The answer presented in the 2012 collection

The cost of designing the theater for 40 and 3000 seats can be determined by the price indicators contained in Table 15 "Theatrical and Entertainment Entertainment" SBCP 81-2001-03, and in accordance with the procedure established by clause 2.1.3 of Section II MU-2009, i.e. . In accordance with the formulas shown in paragraphs 2.1 and 2.3 of Example 2 of Appendix No. 2 MU-2009.

Formula of calculation (theater 40 seats - p. 2.1 of example 2):

1510.00 - [(2058.54-1510.00) / (200-50) x (50-40) x0,6] \u003d 1488.06 thousand rubles, where:

1510,00 - "A" Paragraph 1 Table. No. 15 SBCP 81-2001-03;

2058,54 - "A" Paragraph 2 Table. No. 15 SBCP 81-2001-03;

Formula of the calculation (theater for 3000 seats - p. 2.3 of example 2):

3882.56 + [(3882,56-3437.50) / (2000-1000) x (3000-2000) x0,6] \u003d 4149.60 thousand rubles, where:

3882.56 - "A" paragraph 5 tab. No. 15 SBCP 81-2001-03;

3437.50 - "A" Paragraph 4 Table. No. 15 SBCP 81-2001-03;

0.6 - Reducing the price of amendment (Appendix 1 to MU-2009).

As for the cost of designing the theater for 260 seats, it is defined as the direct price of claim 3 Table. 15 SBCP 81-2001-03, since the specified indicator of the designed object - theater for 260 seats is included in the interval "over 200 to 600" places, and is 2940.74 thousand rubles.

The answer to the update

A fundamental methodological approach to the calculation of the design price given to Question 4 of Section I collection 2012, relevant and currently not subject to adjustment.

5 How to determine the cost of designing platform engineering networks and structures, the construction of which is associated with the main object?

The answer presented in the 2012 collection

For a possible approximate estimate of the cost of designing platform engineering networks and structures, the construction of which is associated with the main object in accordance with the prepared task for design, it is necessary to focus on the level of costs within up to 30% of the price of basic design work.

The cost of such low-voltage networks and systems as a structured cable system, a locally computing network, a system of control and access control, the system of security television is not taken into account of the ICSP 81-2001-03 and are estimated additionally according to the directory of basic prices for project work in the construction of "Communication Objects" ed. 2010

The answer to the update

The basic prices for the design of individual buildings of the SBCP 81-2001-03 take into account the cost of designing external engineering networks within the construction site:

The cost of external engineering networks and structures not taken into account by Basic ICCP 81-2001-03 is determined using the appropriate design object of reference books entered in the federal registry (for example, ICCP 81-2001-02, ICCP 81-2001-07, ICCP 81- 2001-14, ICSP 81-2001-17, etc.).

The cost of such low-voltage networks and systems, as a structured cable system, a locally computing network, a system of control and access control, a system of security television, not taken into account ICSP 81-2001-03 and are estimated additionally according to SBCP 81-2001-02.

6 During the construction of a single-storey house with an attic whether it takes into account in the total volume of the building?

The answer presented in the collection - 2012

When determining the cost of designing a residential building with a mansard floor, the construction volume of the latter is taken into account in the total volume of the building.

The answer to the update

To the question of 6 sections I, the 2012 collection is relevant at present and the adjustment is not subject to.

7 How to determine the cost of developing a sketch project?

The answer presented in the 2012 collection

Development of a draft design of the provisions of the City Planning Code of the Russian Federation dated December 29, 2004 No. 190-FZ and Government Decisions of February 16, 2008 No. 87 is not provided. In this regard, the procedure for determining the cost of development of a sketch project in the LC 2010 is not regulated.

A sketch project can be developed in special cases at the request of the organs of architectural and town-planning supervision, which is reflected in the task of design and the EPZ. The composition and content of the sketching project is determined by urban-planning organizations and is attached to the agent.

In case of the need to develop a sketch project, which should be reflected in the design task, its costs can be calculated in accordance with the complexity of work in coordination with the customer, or, in order to avoid calculating the cost in accordance with the cost calculation in form 3P, use price indicators, The contained in the Siberian Federal District for the conditions of new construction, using the corrective coefficient, the size of which is established by the Contractor in coordination with the Customer.

The answer to the update

To the question of 7 sections I, the 2012 collection is currently relevant and cannot be adjusted.

8 How to determine the cost of promentetics and interiors?

The answer presented in the 2012 collection

The development of architectural solutions of interiors is taken into account by project work, contained in the SBCP 81-2001-03 "Objects of housing and civil construction" 2010, with the exception of the relevant work performed according to GOST 21.507-81.

The price of the specified work, if it is not highlighted in the relative cost tables, can be determined by the developers of project documentation independently within the integrated price for the development of project documentation, including as part of the architectural and construction part.

Approximately, the cost of work on prenets and interiors can be 5-8% of the cost of developing relevant working documentation, depending on the complexity of the work.

The answer to the update

To the question of 8 sections I, the 2012 collection is currently relevant and cannot be adjusted.

9 How to determine the total percentage of the base price if the task for the design of the capital construction object provides for the simultaneous development of project documentation and partial development of working documentation?

The answer presented in the collection - 2012

The base prices contained in the SBCP 81-2001-03 are taken into account the costs of developing project and working documentation without taking into account value added tax.

In the event that the task for the design of the capital construction object provides for the simultaneous development of project documentation and partial development of working documentation, then in accordance with paragraph 1.5. Section I of methodical instructions on the application of reference books for design work in construction, approved by the Ministry of Regional Development of the Russian Federation by order of December 29, 2009 No. 620 and registered by the Ministry of Justice of the Russian Federation dated 03/23/2010 No. 16686 (MU-2009), total percentage The basic price is determined depending on the architectural, functional and technological, constructive and engineering solutions contained in the project documentation, as well as their degree of detail.

The answer to the update

To the question of 9 sections I, the 2012 collection is currently relevant and cannot be adjusted.

10 What expenses for the design of external engineering networks within the construction site are taken into account by price indicators of the SBTP 81-02-02-2001?

The answer presented in the 2012 collection

Price indicators established for the design of individual buildings and contained in the directory of the basic prices for project work in the construction of "housing and civil construction facilities" of the 2010 Edition (ICSP 81-02-02-2001), the costs of designing external engineering networks within the limits Construction site:

Water fluids - to the first well;

Sewage - to the first well;

Power supply - from buildings to a connection point in TP;

Heat supply, heating - from a building to shut-off reinforcement;

Internal gas supply - from the building to the nearest carpet;

Low-current networks - from the building to the nearest well on telephone sewage networks.

The answer to the update

To the question of 10 sections I, the 2012 collection is currently relevant and cannot be adjusted.

11 What costs are not taken into account by price indicators of Table # 1 SBTP 81-2001-03?

The answer to the update

In determining the cost of designing residential buildings at the base prices of Table No. 1, the SBCP 81-2001-03 did not take into account the costs of:

Use of mounted ventilated facades; The cost of these works can be determined additionally as the share of the cost of work under the section "Architectural solutions"; In this case, the indicator of the relative cost of the development of facades (12.5%), shown in Appendix 3 to the MU-2009 (the above-ground part, paragraph 1);

Requirements of retaining walls and stairs; The price of the indicated work is determined by the relevant reference books of basic prices for design work for construction;

Development of dispatching systems for engineering networks and structures, engineering systems;

Design of increased waterproof pumping stations (paragraph 2.1 of section 2 ICCP 81-2001-03); The cost of design work for the construction of these pumping stations is determined by the relevant reference books of basic prices for project work for construction.

The answer to the update

Question 11 of Section I collection-2012 is relevant at present. In addition, the prices of Table No. 1 SBCP 81-2001-03, in addition to the works of the I MU-2009 in paragraph 1.3.6, are not taken into account the costs of design:

Low-voltage networks and systems (structured cable system, locally computing network, control and access control system, security system of security television);

Individual thermal points.

II. Clarifications to determine the basic price of project work on territorial planning and planning of territories

The answer presented in the collection - 2012

In accordance with the existing procedure for calculating the basic price of design work for the construction of objects, the main indicator of which differs from the Basic Pricing Guide for Design Works for the construction of objects (ICC), is allowed only if the object is less than the minimum or more maximum given in Table of prices, no more than 2 times (see paragraph 2.1.3 of the section II of methodical instructions on the application of reference books of basic prices for design work in construction, ed. 2010).

In the case when the design of the design object is less than a double minimum indicator given in the TAP table, the basic price of design work is calculated on the basis of cost-calculation.

At the same time, to determine the design price of an object with an indicator less tabular 2 times or more, according to the directory of the reference book, you can use the corresponding values \u200b\u200bof the values \u200b\u200bof the LC for the object, less table indicator 2 times.

At the same time, a downward coefficient is introduced into the calculation, which takes into account the difference in the complexity of the design of the object under consideration and the object with an indicator, the size of which is 2 times less tabular.

Based on the above, when calculating the price of the development of the General Plan with an indicator of the population of less than 5: 2 \u003d 2.5 thousand people. by tab. 2 ICSP 81-2001-01, the calculation is carried out by 2.5 thousand years. and a downward coefficient is introduced (to reduced) 0.7-0.9 per small number of numbers, i.e. (47.06 + 11.22x2.5) x to lower. x I inf. x ....

The answer to the update

A fundamental methodological approach to the calculation of the design price given to the question 1 of Section II of the 2012 collection is relevant and currently.

At the same time, we give a corrected formula for calculating the value of the development of the general plan with the number of population less than 5: 2 \u003d 2.5 thousand people. Table number 2 SBCP 81-2001-01:

(47.06 + 11.22x (0.4 * 5 + 0.6 * 2.5)) x to lower. x I inf. x ....

At the same time, it should be borne in mind that when financing the development of the General Plan from budget sources (see paragraph 1 of Article 8.3 of Federal Law No. 369-FZ dated 03.07.2016, Appendix 3 to the collection 2007-2017), recommendations for the calculation formula In the question 1 of Section II, the 2012 collection, it is necessary to coordinate with the Ministry of Travel and the Customer, in other cases - with the customer in the formation of contractual prices.

2 How to determine the cost of developing documentation related to landscape design?

The answer presented in the 2012 collection

To calculate the costs of the development of documentation related to landscape design, the price indicators of the table 4 and 5 of the SBTCP 8102-01-2001 "Territorial planning and layout of the territories" editorial will be used. 2010

The answer to the update

On Question 2 of Section II, the 2012 collection is currently relevant and not subject to adjustment.

3 How to determine the cost of developing a dendrological part?

The answer presented in the 2012 collection

The development of a dendrological part in the corresponding design work may be regarded by indicators of P.P. 1 - 7 Tables 5 SBCP 81-01-2001 "Territorial planning and planning of the territories" approved by the Ministry of Regional Development of the Russian Federation Order No. 260 of May 28, 2010 and registered Ministry of Justice of the Russian Federation on September 14, 2010 No. 18239 recommended for use in accordance with the Federal register of estimated standards (reg. No. 130 of 25.10.2010); At the same time, the scope of work performed, focusing on the indicators of the relative cost of developing project and working documentation given in Table. 10 (p. 1) of the specified price document.

The answer to the update

To the question 3 of Section II, the 2012 collection is relevant at present and cannot be adjusted.

4 To which type of coefficients (pricing or complicating) includes coefficients from the Table 8 of the TC "Territorial Planning and Planning of the Territories" ed. 2010?

The answer presented in the 2012 collection

Enhancement coefficients to prices for the development of urban documentation (Table 8, pp 1-3, 5-8) refer to the pricing, and paragraph 4 to complicating.

The answer to the update

The question 4 of Section II collection-2012 is currently relevant and cannot be adjusted.

III. Explanations for the definition of the basic price of design work for the construction of communication facilities

1 How to determine the indicators of the relative cost of developing project and working documentation when designing specific objects within the total cost of design products?

The answer presented in the collection - 2012

Tables of relative cost Nos. 28 - 31 GSH SBCP 81-2001-02 Developed in accordance with the Regulations on the composition of the section of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87.

In accordance with paragraph 1.8 of the methodological instructions on the application of reference books for project work in construction, approved by the Ministry of Regional Development of the Russian Federation by order of December 29, 2009 No. 620 and registered by the Ministry of Justice of the Russian Federation No. 16686 of March 23, 2010, presented in SBTP 81-2001-02 Recommended indicators of the relative cost of developing partitions of project and working documentation, if necessary, can be clarified by the project organization when designing a specific object within total cost, depending on the complexity of the work performed.

At the same time, to determine the indicators of the relative cost of development of project and working documentation in the design of specific objects within the total cost of development of project products, the Center considers it possible to use the indicators of the relative value of the sections given in the tables of the relative value of the development of design and working documentation for the construction of objects contained in the rapid strength In connection with the output of the SBCP 81-02-02-2001 the directory of the basic prices for project work for the construction of "Communication Objects" of the 1996 edition, and lowering factors for the absence of such sections as the "Land Planning Organization Scheme", "Architectural Solutions" , "Constructive and volume-planning solutions", "gas supply", "water supply", "drainage" and other, established ICSP 81-2001-02, in the calculation of the cost of design work for the construction of communication facilities does not apply.

The answer to the update

To the question 1 of section III collection-2012 relevant currently and the adjustment is not subject to. We note that in Tables No. 28, 29 ICCP 81-2001-02 presents the recommended indicative relative costs of the development of partitions of PD (RD) of buildings and constructions of communication, and in Tables No. 30, 31 SBCP 81-2001-02 - Linear communication objects . The above-mentioned SBTP tables 81-2001-02 do not apply to engineering and technical support systems (communication, low-current networks), the definition of which is given in paragraph 21 of Article 2 of the Technical Regulations on the safety of buildings and structures.

2 What design objects refer to linear communication facilities for ICSP 81-2001-02?

The answer presented in the 2012 collection

Linear objects include all the facilities, the price indicators of which in the state estimate standard "The directory of the basic prices for project work in the construction of" Communication facilities "ed. 2010 (ICCP 81-2001-02) are established per unit length (PM; km ), And the remaining structures reflected ICSP 81-2001-02 belong to the objects of industry (buildings, structures).

The answer to the update

On Question 2 of Section III, the 2012 collection is currently relevant and cannot be adjusted. Please note that the definitions of buildings, structures, linear objects, engineering and technical support systems are given in paragraph 21 of Article 2 of the Federal Law "Technical Regulations on the Safety of Buildings and Farms" of December 30, 2009 No. 384-FZ.

3 How to determine the cost of designing cable communication lines with optical fiber cable?

The answer presented in the 2012 collection

The cost of designing cable lines of communication with the optical-fiber cable is recommended to be determined by the price indicators contained in paragraphs 10-12 of the table 4 "Cable lines of the" State estimated standard "Certificate of Basic prices for project work in the construction of" Communication Objects ", approved by the Ministry of Regional Development RF in order No. 260 of May 28, 2010 and registered by the Ministry of Justice of the Russian Federation on September 14, 2010 No. 18439.

The answer to the update

To Question 3 of Section III collection-2012 relevant currently and cannot be adjusted.

IV. Clarifications to determine the basic price of design work for the construction of machine-building facilities

1 How is the cost of designing the object of the machine-building industry in case the construction is carried out in the steps?

The answer presented in the collection - 2012

When designing an object of the machine-building industry, the construction of which is carried out in the stages, the cost of design work is determined for each stage based on the cost of construction of objects included in the stage, in the manner prescribed by the reference book for project work for the construction of "Machine-building facilities" editions of 1995 and methodological instructions of the 2010 edition

The answer to the update

To the question of 1 section of the IV collection-2012, currently currently not subject to adjustment.

V. Explanations for the definition of the basic price of design work for the construction of public roads and urban engineering structures and communications

1 How to determine the cost of preparing the design and working documentation of the automotive road sections with a length of 2 km and less?

The answer presented in the collection - 2012

The cost of preparing the project and working documentation of the units of the automotive road with a length of 2 km and is less determined by the price indicators of P.P. 1-3 Tables No. 2 of the directory of basic prices for design work for the construction of "General use" ed. 2007 on the object as a whole - the "road", regardless of the length. Accordingly, with the length of the designed section of the highway less than 2 km, when calculating the basic price of the interpolation formula is not applicable, and it is necessary to use the specified price indicators only depending on the category of design complexity.

The answer to the update

To the question of 1 section V, the 2012 collection is relevant at present and the adjustment is not subject to.

2 How the price calculation of the price indicators of table 11 "Quarterly, intercombartes, street cable power grids" LBS "City Engineering Constructions and Communication" ed. 2008 (LFC-2008): Based on the total length of cables or trench lengths?

The answer presented in the collection - 2012

In accordance with Note 2 to Table 11 Table 11, when determining the cost of designing cable lines, the price calculation is carried out on the basis of the total length of all cables. Under cable lines refers to a cable consisting of 3 or more lived. Therefore, they are summarized at no length live, but the length of cables consisting of twisted in them. In case of one trench there is more than one cable line, their lengths are summed up.

The answer to the update

The provisions of the SBC 2008 in terms of applying table 11 "Quartal, intercombartes, street cable electrical stars" are excluded from the federal registry. To determine the cost of designing quarterly, escarbartal, street cable power grids should be applied to ICCP 81-2001-07.

In accordance with paragraph 2.8.1.1, the SBCP 81-2001-07 is to determine the cost of designing cable lines using Table No. 17 Calculation of the price is carried out on the basis of the total length of all cables. Under cable lines refers to a cable consisting of 3 or more lived. Therefore, they are summarized at no length live, but the length of cables consisting of twisted in them. In case of one trench there is more than one cable line, their lengths are summed up.

3 How to determine the cost of designing the system of operational-remote control of the humidity of isolation (ADC) with a chamberless laying of heat networks?

The answer presented in the 2012 collection

The performance of the hydraulic calculation, as part of which the CHC system is developed, when designing pipelines, including for the chapeless gasket of thermal networks, is part of the work on the design of heat networks, and in the case of its execution on a separate task, it may be regarded on the basis of the cost of basic work with downgraders The coefficient in accordance with the actual labor intensity.

The answer to the update

To the question 3 of the section V, the 2012 collection is relevant at present and the adjustment is not subject to.

4 In determining the value of underground pedestrian crossings, all additional costs associated with the introduction of a provision on the composition of the partitions of project documentation and requirements for their content, as well as changes to Him, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87, respectively, from 13.04 .2010 № 235 and 02/15/2011 № 73?

The answer presented in the 2012 collection

The prices of the directory of basic prices for project work for the construction of "City Engineering Constructions and Communications" ed. 2008, on the price indicators of which the cost of underground pedestrian transitions is determined, all additional costs associated with the introduction of a provision on the composition of the partitions of project documentation and requirements for their content, as well as changes to it, approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87, respectively, dated 04/15/2010 No. 235 and on February 15, 2011 No. 73, incl. And with the development of Section 10 "Activities for Access Disabled", and no additional payment is subject to.

The answer to the update

The provisions of the SBC 2008 in terms of the application of price indicators for which the cost of designing underground pedestrian crossings is determined from the federal registry. To determine the cost of performing these works, we should use Table No. 13 of the SBCP 81-2001-16. The provisions of the SBCP 81-2001-16 take into account the requirements of the designations of underground pedestrian crossings operating at the time of development and approval of the reference book, i.e. As of January 1, 2015

Vi. Clarifications to determine the basic price of design work for the construction of fire and security systems

1 In which cases, a reference book of basic prices for design work for the construction of the "fire and security protection system" is applied. 1999?

The answer presented in the collection - 2012

Directory of basic prices for design work for the construction of the "Fire and Security Protection System" ed. 1999 (SBTC-99) is used to determine the basic price of designing these systems only when performing work outside the complex, according to a separate task for design.

The answer to the update

To question 1 section VI collection-2012 relevant currently and is not subject to adjustment.

2 How to determine the cost of performing project work on the evacuation of people in a fire?

The answer presented in the collection - 2012

Calculation of the cost of designing the evacuation of people in the fire is an integral part of the section "Fire Safety Activities" section, the costs for the specified work are taken into account by complex prices for the design of the main object of capital construction and additional payment is not subject to.

The answer to the update

On Question 2 of the VI section of the 2012 collection is currently relevant and cannot be adjusted.

VII. Explanations for the definition of the basic price of design work for the construction of artificial structures

The answer presented in the collection - 2012

When designing pedestrian crossings with individual structural elements (span structures, supports) according to the reference book of basic prices for design work for the construction of "artificial structures" ed. 2004 The price of work is defined in Table 1 in accordance with the procedure established by clause 2.2 of Chapter 2, while calculating the design price of supports in Table 4, the corresponding share of costs is excluded from the complex price completely.

The answer to the update

When designing pedestrian crossings with individual structural elements (span structures, supports), the price of work is determined in accordance with the provisions of chapter 2.1 SBCP 81-2001-16 according to Table No. 1, while calculating the design of supports in Tables No. 3, 4 requires adjustment The indicators of the relative value shown in Tables No. 15, 16 of the SBCP 81-2001-16, taking into account the provisions of paragraph 2.1.11.

2 How to apply the coefficients listed in P.P. 2.6 and 2.7 Table 1 of the reference book of basic prices for design work for the construction of "artificial structures" ed. 2004 (SBC-2004)?

The answer presented in the collection - 2012

The use of the coefficients listed in P.P. 2.6 and 2.7 to Table 1 of the ICC-2004, possibly in the design of bridges, overpasses and an overpass with type spans and individual structures of the supports using typical structural elements (see the first paragraph of paragraph 2.2 of Section 2 of the ICC-2004).

In all other cases, the listed coefficients are introduced to calculations on the price indicators to Tables 3, 4 ICC-2004.

The answer to the update

The STC-2004 has lost its strength due to the introduction of the SBCP 81-2001-16. When determining the design cost of the specified reference book, it should be borne in mind that the use of the coefficients listed in paragraphs 2.1.16 and 2.177 chapters 2.1 to Table No. 1 of the SBCP 81-2001-16, possibly in the design of bridges, overpasses and an overpass with typical spans and individual structures of supports using typical structural elements (see the first paragraph of clause 2.1.11 chapter 2.1 SBCP 81-2001-16).

In all other cases, the listed coefficients are introduced to the calculations on the price indicators to Tables 3, 4 of chapters 2.1 to Table No. 1 ICCP 81-2001-16.

VIII. Clarifications to determine the basic price of design work for the construction of road transport enterprises.

1 How to determine the cost of designing 2 check-in identical points for 2 posts?

The answer presented in the collection - 2012

The cost of designing 2 check-in identical points for 2 posts can be determined according to claim 30 of the table 2 of the reference book for design work for the construction of "automotive transport enterprises" ed. 2006 by the formula:

On the reuse of identical gearbox (see paragraph 3.2 of the methodological instructions on the application of reference books for project work in construction ed. 2010);

1.1 - an increase in the cost in connection with the introduction of a provision on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation on February 16, 2008 No. 87 and dated April 13, 2010 No. 235;

3.31 - Inflationary index to the cost of design work at the IV quarter of 2011 (Letter of the Ministry of Regional Development of the Russian Federation of 07.11.2011 No. 30394-IP / 08).

The answer to the update

To question 1 section of the VIII collection-2012 relevant currently and is not subject to adjustment. The inflationary index is used in the amount established by the Ministry of Economy of Russia for the corresponding period of work.

IX. Clarifications to determine the value of other design or related work design

The answer presented in the collection - 2012

In accordance with the letter of the Ministry of Construction of Russia of 04.07.95. No. 9-4 / 116 The average index of changing basic prices for project work for construction from a level as of 01.01.91 to the level as of 01.01.95, equal to 1000 and It was applied to the prices of the collection of prices for project work for the construction of ed. 1987-1990, the level of which is 01.01.91, in accordance with the letter of the USSR State Building of September 6, 1990 No. 14- "D".

Due to the denomination and change in the scale of prices (1000 times) in determining the basic prices for project work for the construction of the prices and reference books of the basic prices for design work for the construction of ed. 1987-1990 and 1995-1999 Accordingly, the prices in which are established depending on the natural indicators of design facilities, it should be guided by the provisions set forth in the letter of the Russian State Truck of 13.01.98 No. 9-1-1 / 6 "On the definition of basic prices for design and survey work for construction after 01.01. 98 g. ", As well as quarterly indexes of changes in the value of design work due to inflationary processes.

Thus, based on the inflation rate as of 01.01.95 (1000) and the scale of the denomination (1000 times), the price changes index for design work, set as follows 01.01.91 and on 01.01.95 the same and Makes up at the first quarter of 2001 - 7.71 (a letter of the state system of Russia dated January 4, 2001 No. Ash- 9/10).

The answer to the update

To the question 1 of the IX section, the 2012 collection is currently currently not subject to adjustment. Indices for changing the cost of design work due to inflation processes, published quarterly by the Ministry of Sports of Russia, are given to this collection.

2 How to determine the cost of developing pre-project documentation?

The answer presented in the collection - 2012

Development of pre-project documentation by the provisions of the Urban Planning Code of the Russian Federation dated December 29, 2004 No. 190-FZ and the Regulations on the composition of the section of project documentation and requirements for their content, approved by the Government Decree of February 16, 2008 No. 87, is not provided. In this regard, the procedure for determining the cost of developing pre-project documentation in the reference books of basic prices for project work in construction (reference books) is absent.

Pre-project documentation can be developed on the task of the Customer, which is reflected in the design task.

If it is necessary to develop pre-project documentation, its costs can be calculated in accordance with the complexity of work in coordination with the Customer, or, in order to avoid calculating the cost in accordance with the cost calculation in form 3P, pricing indicators are used for project work contained in reference books for the conditions of new construction. , using the corrective coefficient, the size of which is established by the Contractor in coordination with the customer.

The answer to the update

On Question 2 of Section IX collection-2012 is currently relevant and cannot be adjusted.

3 How to determine the costs of making changes (adjustment) in project and working documentation?

The answer presented in the 2012 collection

In accordance with paragraph 1.3.6.3 of the I "The Basic Provisions" of the Methodological Instructions on the application of reference books of basic prices for design work in the construction approved by the Ministry of Regional Development of the Russian Federation by order of December 29, 2009 No. 620, the prices of these reference books are not taken into account the costs of making changes ( Adjustment) to project and working documentation, with the exception of the correction of errors made by the project organization.

In the case of the design organization, the adjustment of project and working documentation in connection with the refinement of work at the request of the Customer, costs can be compensated for funds allocated in the consolidated estimate calculation of the cost of construction (SSRS) for unforeseen work and costs, which stipulated by paragraph 4.96 of the definition methodology The cost of construction products in the Russian Federation, approved by the Resolution of the Gosstroya of the Russian Federation of March 05, 2004 No. 15/1 (MDS 8135-2004).

The answer to the update

To question 3 of the IX section, the 2012 collection is currently relevant and cannot be adjusted.

The answer presented in the 2012 collection

Prices for design work for construction are established in the reference books of basic prices for favorable engineering and geological conditions, i.e. design, mainly tape and columnar foundations. In the presence of soils with low bearing capacity and increased depth of the foundation, requiring, in particular, the design of pile grounds, the price of relevant design work is calculated on a specialized reference book for project work for construction " Pile foundations "Ed. 2004

At the same time, the costs of ordinary foundations in the amount established in Annex 3 to the methodological instructions on the application of the reference books for design work in construction should be excluded from the comprehensive price of design. 2010 (hereinafter referred to as guidelines).

The answer to the update

Prices for design work for construction are established in the reference books of basic prices for favorable engineering and geological conditions, i.e. design, mainly tape and columnar foundations. In the presence of soils with a low bearing capacity and requiring increased depths of the foundations, as well as requiring, in particular, the design of pile grounds, the price of relevant design work is calculated by specialized SCPP 81-2001-15.

At the same time, the costs of ordinary foundations in the amount established in Appendix 3 to the MU-2009 should be excluded from the complex price for design.

5 How to determine the basic price of the development of technical documentation for demolition and disassembling construction objects?

The answer presented in the 2012 collection

At the same time, the guidelines may be the guidelines of clause 2.13 of Chapter 2 of the reference book of basic prices for design work for the construction of "Objects of Main Transport of Oil" ed. 2007, containing indicators for calculating the specified costs: 0.35 - for linear objects and 0.2 - for platforms from the total price of design work (P + P).

The answer to the update

Design work on demolition and dismantling construction facilities are not taken into account prices for the development of project and working documentation for the construction of new facilities and are estimated additionally on the relevant price documents or, in case of their absence, based on the design price of the relevant new construction facilities.

In this case, the guidelines of paragraph 1.19 of Chapter 1 of the ICCP 81-2001-07, containing indicators for calculating the specified costs: 0.35 - for linear objects and 0.2 - for site facilities on the total price of design work (PD + RD).

6 How to determine the cost of developing a structured system for monitoring and managing engineering systems of buildings and structures (ISMS)?

The answer presented in the collection - 2012

The cost of developing a structured system for monitoring and managing engineering systems of buildings and structures (Smits) is not included in the cost of the ITM of the corresponding construction object. Assessment of these work can be implemented in accordance with the procedure established by clause 2.1.4 of the methodological instructions on the application of reference books for design work in the construction of the 2010 edition, i.e., on the basis of costing (f. 3P).

The answer to the update

To the question 6 of the IX section of the 2012 collection is relevant at present and cannot be adjusted.

7 How to determine the value of the section "Events to ensure compliance with the requirements of energy efficiency and the requirements of the equipment of buildings, buildings and structures of taking into account the energy resources used"?

The answer presented in the 2012 collection

With the introduction of a provision on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87, as well as changes to it, approved by the RF Rules of April 13, 2010 No. 235 and from 02/15/2011 No. 73 (hereinafter referred to), there was a certain increase in the amount of work in the preparation of project documentation: on the one hand, due to the expansion of the composition and requirements for the content of project documentation sections, including the transfer of a number of issues that were worked out in detail when Development of working documentation, on the first stage of design. In addition, a number of new and "tightening" of the current requirements for industrial, fire, environmental, sanitary and epidemiological safety of construction facilities, etc. appeared.

Thus, additional requirements for the developed project documentation in accordance with the introduction of the provisions and changes to it, including section 10 (1), "measures to ensure compliance with the requirements of energy efficiency and requirements for the equipment of buildings, buildings and structures of accounting devices used Energy resources "can be compensated additionally to the recommended additional cost in the specified amount to the total design cost.

As for the reference books of the basic prices, entered into action after February 16, 2008, that is, the ICCP 81-2001 (01; 02; 03), then the costs contained in them are taken into account and additional payments are not subject to.

The answer to the update

The question 7 of the IX section of the 2012 collection is currently relevant with the use of SC and ICC. At the same time, it should be borne in mind that the cost of developing a section "Events to ensure compliance with the requirements of energy efficiency and the requirements of the equipment of buildings, buildings and structures of the instruments of accounting of energy resources used" is taken into account by ICSP prices.

8 How to determine the cost of energy surveys (energy audit) and compiling the energy passport of the construction facility for budget customers?

The answer presented in the 2012 collection

In accordance with Article 15 of Chapter 4 of the Federal Law of November 23, 2009 No. 261-FZ "On Energy Saving and the Enhancement of Energy Efficiency and Amendments to Certain Legislative Acts of the Russian Federation" Energy Survey (Energy Audit) can be carried out in respect of products, technological Process, as well as a legal entity, an individual entrepreneur.

Works on energy surveys are not included in the design documentation performed in accordance with the Regulations on the composition of the sections of the project documentation and the requirements for their content, approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87, as well as changes to it approved by the Government Resolutions RF dated April 13, 2010 № 235 and 02/15/2011 No. 73 (hereinafter referred to as the position).

With the introduction of the above position, there has been a certain increase in the scope of work in the preparation of project documentation: on the one hand, due to the expansion of the composition and requirements for the content of project documentation sections, including with the transfer of a number of issues that were worked out in detail when developing working documentation, The first stage of design. In addition, a number of new and "tightening" of the current requirements for industrial, fire, environmental, sanitary and epidemiological safety of construction facilities, etc. appeared.

To account for the above circumstances in the price documents imposed on February 16, 2008, it is advisable to clarify the percentage in determining the costs of the development of project and working documentation with an increase in the share of costs in the "P" stage by 10% with a possible increase in total costs On design work as a whole from 6 to 14% (average 10%) with the appropriate regulatory justification and attachment of calculations.

Thus, additional requirements for the design documentation developed in accordance with the introduction of the situation and changes to it, including the preparation of the energy passport, can be compensated for additionally to the recommended additional costs in the specified amount to the total design cost.

As for the reference book of the basic prices for project work in the construction of "Housing and Civil Engineering Objects" SBCP 81-2001-03, introduced into action after February 16, 2008, the above-mentioned costs of the preparation of an energy passport and additional costs were taken into account in the price indicators Payment is not subject to.

The answer to the update

The question 8 of the IX section of the 2012 collection is currently relevant at present and cannot be adjusted.

9 How to determine the price of developing project and working documentation for the construction of enterprises, buildings and structures in difficult conditions (eternal, subsidence, etc. Soils, seismicity)?

The answer presented in the collection - 2012

In accordance with paragraph 3.7 of the section III of methodological instructions on the application of reference books of basic prices for project work in the construction of ed. 2010. The price of developing project and working documentation for the construction of enterprises, buildings and structures in difficult conditions (eternal, subsidence, etc. Soils, seismicity) is determined by price indicators of reference books established from natural indicators of design objects, using boost factors to the cost of those sections (subsections) of project and working documentation, to the development of which the current regulatory documents are established by special requirements, leading to an increase in the complexity of design work (architectural and construction, water supply, drainage, etc., part of the estimated partition relating to the listed sections).

The answer to the update

To the question of 9 Section IX, the 2012 collection is currently relevant and cannot be adjusted.

10 How to determine the cost of developing sections "Project Recultivation of Land Fund Lands and" Forest Development Project "?

The answer presented in the 2012 collection

In accordance with the Regulations on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87, section 12 "other documentation ..." should contain documentation, the need to develop which in the implementation of the design and construction of an object Capital construction is provided for by the legislative acts of the Russian Federation, including the "Project Recultivation of Land Fund" and "Forest Development Project".

At the same time, the costs associated with the implementation of the specified work, if they are not taken into account by the complex prices of the reference books of the basic prices for design work for construction (ICC), can be determined:

Technical recultivation of land - according to the price indicators of P.P. 3.12 - 3.17 Tables 3 TAPs "Industry Objects Chemical Fiber" ed. 2004; P.P. 3.14 - 3.19 Tables 7 Table "Objects of the oil refining and petrochemical industry" Ed. 2004, as well as on pp 28.1 - 28.7 Tables 4 TAPs "Objects of Main Transport Oil" ed. 2007;

Biological Recultivation of Lands - By P.P. 9 - 12 Table Table "Forestry Objects" ed. 2006 and on P.P. 28.1 Tables 4 and annexes to the table of paragraph 11 of the TC "Oil Main Transport Objects" ed. 2007;

- "Forest Development Project" - based on the laboriousness of work on the basis of costing Costs in the form 3P, given in MDS 81-35.2004

The answer to the update

Question 10 Section IX collection 2012 is currently relevant. At the same time, instead of excluded from the federal registry, the Objects of the oil refining and petrochemical industries "ed. 2004 and LC "Oil Main Transport Objects" ed. 2007 It is necessary to apply the provisions of the SBCP 81-2001-13 and the ICSP 81-2001-08, respectively.

11 What is the procedure for allocating start-up complexes in the composition of project and working documentation for construction?

The answer presented in the collection - 2012

In accordance with the Regulations on the composition of the sections of the project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of 16.02.2008 No. 87, the allocation of start-up complexes in the composition of the project and working documentation for construction is not provided.

If it is necessary to fulfill the above work on the special task of the Customer, their value is defined as a share of the total design price, that is, in the calculation formula, a downward coefficient is introduced, taking into account the actual amount of work performed.

The answer to the update

To question 11 of the IX section of the 2012 collection, currently currently not subject to adjustment.

The answer presented in the 2012 collection

The basic requirements for working documentation, as well as their composition of GOST R 21.1101-2009 SPDS "Basic Requirements for Project and Work Documentation". The brands of the main sets of work drawings are contained in Appendix B to the specified GOST.

Working drawings, including the AC, KM, KZ, are the subject of working out the working documentation of the relevant capital construction object, therefore, the costs of their implementation are taken into account by project work and can be allocated from the total cost of design (sections: architectural, structural and volumetric Planning solutions) of a specific object depending on the complexity of the work.

The answer to the update

A fundamental methodological approach to determining the value of the development of working drawings of the AC, km and KZ is relevant at present and the adjustment is not subject to. At the same time, the basic requirements for working documentation, as well as their composition, are currently established by GOST R 21.1101-2013 "SPDS. Basic requirements for project and working documentation".

13 On the cost level in the column "Estimated documentation" of the table of the relative cost of development of project and working documentation for the construction of facilities?

The answer presented in the 2012 collection

The indicators of the relative cost of design work given in the tables of reference books for design work for construction are purely approximate and reflect the technology of project documentation development technology from the organization - reference book.

At the same time, attention should be paid to the cost level in the column "Estimated documentation" of the table of the relative value of the development of project and working documentation for the construction of objects:

If it is up to 10%, it does not take into account the scope of work, and the specified work is included in the cost of developing specialized design sections;

If it is more than 10%, then the scope of work is provided for by this graph.

The answer to the update

To the question 13 of the IX section of the 2012 collection, the currently relevant is not subject to the adjustment.

14 What objects relate to particularly dangerous and technically difficult, and what are the unique?

The answer presented in the 2012 collection

The concepts "especially dangerous, technically complex and unique objects" in determining the cost of design work on the reconstruction of enterprises, buildings and structures are taken into account in accordance with Article 48.1 of the Town Planning Code of the Russian Federation dated December 29, 2004 No. 190-FZ (with changes and additions), This paragraph 1 of this article establishes the objecting objects to particularly dangerous and technically difficult, and paragraph 2 - to unique objects.

With regard to the use of increasing coefficients to 2.0 and to 1.7 in the formula for calculating the price of design work on the reconstruction of construction objects, the coefficient up to 2.0 is taken into account if the price is established from natural indicators (power, performance, length, area, etc. ), and to 1.7 - when calculating the cost of design in percentage of investment.

The answer to the update

The question 14 of the IX section of the 2012 collection is currently relevant and cannot be adjusted.

15 Is the development of isometric drawings taken into account in the cost of creating a three-dimensional electronic model design model?

The answer presented in the 2012 collection

The cost of developing isometric drawings of building structures, equipment, pipelines, etc. To create a three-dimensional electron model, it is determined additionally to the prices of reference books for design work in construction in accordance with cost-calculation.

The answer to the update

At the question 15 of the IX section of the 2012 collection, the 2012 is currently relevant and cannot be adjusted, except for the applications of the provisions of the SBCP 81-2001-21. In addition, in the general provisions of individual ICSP, the procedure for applying and the size of corrective coefficients is introduced when determining the cost of designing with information modeling.

16 How many copies of the project and working documentation taken into account the prices of reference books?

The answer presented in the 2012 collection

In accordance with clause 3.10 of the methodological instructions on the application of reference books of basic prices for project work in the construction of ed. 2010 (MU-2009) The prices of reference books take into account the issuance of 4 copies of the design and 4 copies of working documentation.

The cost of an additional number of copies of the design and working documentation issued at the request of the Customer can be determined by calculating the cost in accordance with the costs of costs and taken into account in the total cost of work on contracts for the development of project and working documentation.

The answer to the update

The question 16 of the IX section of the 2012 collection is currently relevant and not subject to adjustment.

17 How to determine the cost of costs for the examination of design and survey work?

The answer presented in the 2012 collection

The cost of expertise of design and survey work (PI), included in chapter 12 of the consolidated estimated calculation of the cost of construction, is determined by the indicators established in the annex to the Decree of the Government of the Russian Federation of 05.03.2007 No. 145 based on the total cost of the PIR in the level of 01.01 .2001, followed by their indexation in accordance with the data published by the quarterly Ministry of Regional Development of the Russian Federation.

The price-defined in this way includes the costs of all sections of expert work, including the examination of industrial safety, environmental, estimated calculations, etc.).

The answer to the update

The question 17 of the IX section of the 2012 collection is currently relevant and cannot be adjusted. At the same time, the price indexation is carried out in accordance with inflationary indices (this collection).

18 How is the compilation of custom specifications on equipment?

The answer presented in the 2012 collection

Claim 4.5 explanations for the application of a collection of prices and reference books of basic prices for project work for construction, approved and recommended for the application at a meeting of the Interdepartmental Commission for the Development of Pricing Documents in Construction Under Gosstrel of Russia on May 28, 1999, has lost strength, since his editorial board corresponded Work on the preparation of custom specifications in the amount of the requirements of the USSR State Bank.

Considering that the compilation of custom equipment is the function of the customer-developer, in case the Customer instructs the project organization to work on compiling custom specifications (in the form established by the equipment manufacturer), then it is paid in addition to the cost of design work in the amount up to 10% of the design cost of the relevant sections of the project documentation (technological, plumbing, etc.).

The project organization conveys the Customer as part of the design documentation developed only on equipment specifications.

In the event that the project organization passes as part of the design documentation "Collection of Specifications for Equipment" (including in Excel format), made by a separate volume, then the specified work is paid by the Customer additionally in the amount of 2% of the design cost of the relevant sections.

The answer to the update

To the question 18 Section IX collection-2012 relevant now and cannot be adjusted.

19 Is there a new price document instead of the price tag for the development of project organizations of the USSR design documentation for the manufacture of non-standardized Equipment of the 1987 edition?

The answer presented in the 2012 collection

Currently there is a reference book of the basic prices for the development of design documentation of equipment of individual manufacture, coordinated with the Committee of the Russian Federation for Mechanical Engineering and Enforced from 09/01/1998 (SB-1998), instead of the price tag for the development of project organizations of the USSR design documentation for manufacture non-standardized equipment of the 1987 edition

The SBT-1998 is included in the register of estimated standards to be used in determining the estimated cost of capital construction objects, the construction of which is planned to be carried out with the involvement of the federal budget (registry), and has a registration number 77 of 15.12.2009.

The answer to the update

To the question of the 19th section of the IX collection-2012, currently currently not subject to adjustment.

Appendix 1

Scroll
existing state estimated standards for project work introduced by the Ministry of Economics of Russia to the Federal Register, as of 03/01/2017

Table 1

No. p / p Reduced standard Name of the state estimate standard Information on the enactment of the document The date and number of the order of FOOV Registration number of the estimated standard and the date of its inclusion in the registry * Basic price dependence in the directory
1 2 3 4 5 6 7
References for basic price levels on 01.01. 2001 Preparation of project documentation in accordance with SNiP 11-01-95 "Instructions on the procedure for developing, coordination, approval and composition of project documentation for the construction of enterprises, buildings and structures"
1 SBT-NDP-06 Directory of basic prices for project work for the construction of "Objects of the oil industry" - № 12 15.12.2009 NP.
2 SBT-UP-06 Directory of basic prices for project work for the construction of "coal industry facilities" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - № 18 dated 12/15/2009 NP.
3 SBT-AP-04 Directory of basic prices for design work for the construction of "Objects of the Aluminum and Electrode Industry" - № 21 dated 12/15/2009 NP.
4 SB PRP-04 Directory of basic prices for project work for the construction of "mining facilities" - № 22 dated 12/15/2009 NP.
5 SBT-PKV-04 Directory of basic prices for project work for the construction of "Chemical Fiber Industry Objects" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 25 dated 12/15/2009 NP.
6 ICC-PPMU-06 Directory of basic prices for project work for construction "Objects of production of mineral fertilizers and other chemical production" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - № 26 dated 12/15/2009 NP.
7 ICC-PSS-06 Directory of basic prices for design work for construction "Industry facilities synthetic resins and plastic masses, fiberglass and fiberglass. Production of plastic products" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - № 27 dated 12/15/2009 NP.
8 SDP-04 Directory of basic prices for project work for the construction of "shipbuilding industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 43 dated 12/15/2009 KV, NP - sewage treatment plants
9 LC-LH-06 Directory of basic prices for design work for the construction of "Forestry Objects" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - № 46 dated 12/15/2009 NP.
10 SBTC-MKP-04 Directory of basic prices for design work for the construction of "facilities of the flourishing and combustion industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of 08.06.2004 No. Ap-3030/06 - № 55 dated December 15, 2009 NP.
11 SBC-MVS-06 Directory of basic prices for design work for the construction of "objects of ameliorative and water construction" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 56 of 12/15/2009 NP.
12 ICC-Pau-08 Directory of basic prices for project work for construction "Objects for the production of nitrogen fertilizers and organic synthesis products. Oxygen sub-sectoral. Methanol subproduction" Order of Rosstroy from 04/30/2008 No. 143, a letter of Rosstroy on the introduction of on 18.03.2008 No. WB-750/02 - № 62 dated 12/15/2009 NP.
13 SBT-M-04 Directory of basic prices for design work for the construction of "Metro Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 69 of 12/15/2009 NP.
14 SBT-PAT-06 Directory of basic prices for project work for the construction of "automotive transport enterprises" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - №70 dated 12/15/2009 NP.
15 SBT-RT-04 Directory of basic prices for project work for the construction of "River Transport Objects" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 71 of 12/15/2009 KV; NP - water approaches and raids
16 SBT-MT-04 Directory of basic prices for project work for the construction of "Objects of Maritime Transport" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 73 of 12/15/2009 KV; NP - ship repair plants, individual objects outside the complex
17 ICC ad-07 Directory of basic prices for project work for the construction of "General use roads" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of 09.10.2007 №k-3743/02 - № 75 of 12/15/2009 NP.
18 ICC-GOCO-06 Directory of basic prices for project work for construction "Engineering and technical measures of civil defense. Events to prevent emergency situations. Protective buildings of civil defense and other special structures" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy about the introduction of 14.01.2006 No. SK-31/02 - № 81 dated December 15, 2009 NP.
19 ICC-GIS-08 Directory of basic prices for design work for the construction of "City Engineering Constructions and Communications" (operates with the exception of chapter 2 "City Transport Tunnels and Pedestrian Transitions", chapters 3 "Underground Communication Tunnels", chapters 4 "urban water supply", chapters 5 "City sewage ", chapters 6" city reservoirs ", chapters 7" Quartal, intercombranch, street cable electrical stars ", tables No. 2 - 11 to chapters 2 - 7 of this reference book) Order of Rosstroy dated April 30, 2008 No. 143, a letter of Rosstroy about the introduction of 24.04.2008 No. WB-1711/02, the order of the Ministry of Internal Affairs of Russia from 02.27.2015 No. 140 / - № 65 dated 12/15/2009 NP.
20 SBT-PP-04 Directory of basic prices for design work for construction "Industrial furnaces, dried, flue and ventilation pipes, constructions of thermal insulation and anti-corrosion protection" Order of Rosstroy dated 04/20/2007 No. 110, a letter of Rosstroy on the introduction of on 07.05.2004 No. AP-2642/10 - № 84 of 12/15/2009 NP.
References for basic price levels as of January 1, 1995 (10 standards) Preparation of project documentation in accordance with SNiP 11-01-95 "Instructions on the procedure for the development, coordination, approval and composition of project documentation for the construction of enterprises, buildings and structures"
21 SBC-GP-99 Directory of basic prices for project work for the construction of "Gas Industry Objects" (2nd edition) Order of Rosstroy dated 04/20/2007 No. 110, a letter of the State Construction of Russia on the introduction of from 07.12.99 No. NZ-4298/10 - № 17 dated 12/15/2009 NP.
22 SBC-OE-96 The guide of the basic prices for design work for the construction of "Energy Objects" (operates with the exception of Table No. 1 "Paroturbine Condensation Electrical Stations (CAC) with blocks of a unit capacity of up to 300 MW; 500, 800 MW and Heat Electrical Stations (CHP)", Tables No 2 "separate boiler rooms", tables No. 3 "Diesel power plants", Tables No. 4 "Gas turbine power plants (GTES) with aggregates with a capacity of up to 12 MW, 15-30 MW", Tables No. 5 "Heat Networks", Tables No. 6 "Special Installations heat networks ", Tables number 8" Open electrical substations with voltage 110-750 kV ", Tables number 9" Repair and production bases of power grids and repair and operating points of electrical stases ", Tables No. 10" Electricity air lines with a voltage of 110750 kV ", Tables No. 11 "LAP voltage up to 10 kV with substations with a voltage of 635 / 0.4 kV; LEP 35 kV; transformer substations 35/6 -10 kV") Order of Rosstroy dated 04.20.2007 No. 110, RESOLUTION OF THE MONSTRUCTION OF RUSSIA APPLICATION ON ON 25.11.96 No. 18-82 - № 9 15.12.2009 Kv.
23 ICC Mashp-95 Directory of basic prices for design work for the construction of "Machine-building facilities" Order of Rosstroy dated 04/20/2007 No. 110, RESOLUTION OF THE CONSTRUCTION OF RUSSIA APPLICATION ON 11.08.95 No. 18-82 - № 42 of 12/15/2009 Kv.
24 SBD-CBP-96 Directory of basic prices for design work for the construction of "Cellulosen and Paper Industry Objects" Order of Rosstroy dated 04.20.2007 No. 110, RESOLUTION OF THE INSTRUCTION OF RUSSIA APPLICATION ON 07.03.96 No. 18-19 - № 47 dated 12/15/2009 KV, NP - Plants, Factory
25 STC-PSM-97 Directory of basic prices for project work for the construction of building materials industry facilities Order of Rosstroy dated 04.20.2007 No. 110, Resolution of the Gosstroy of Russia on the introduction of on 23.06.97 No. 18-18 - № 48 dated 12/15/2009 NP.
26 SB PGF-95 Directory of basic prices for project work for the construction of "Printing Industry Objects" Order of Rosstroy dated 04.20.2007 No. 110, Resolution of the Russian State Instructions on the Action of 08.02.95 No. 18-13 - № 57 of 12/15/2009 NP.
27 ICC-pos-99 Directory of basic prices for design work for the construction of "Fire and Security Protection" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the Gosstroy on the introduction of 21.09.99 No. NZ-3287/10 - № 82 dated 12/15/2009 NP.
28 SB CD-98 Directory of basic prices for the development of design documentation of equipment of individual manufacture Letter of the State Superstantum of Russia on the introduction of from 16.06.98 No. 9-10-17 / 33 - № 77 of 12/15/2009 NP.
Standards of the USSR State Construction: Collections of basic price levels as of 01/01/1991 (29 standards) Preparation of project documentation in accordance with SNiP 1.02.1-85 "Instructions on the composition, procedure for the development, coordination and approval of design and estimate documentation for the construction of enterprises , buildings and structures. "
29 SC-2-87 Collection of prices for project work for construction. Section 2 "Oil Industry" (operates with the exception of chapters 1, 2) Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 27.02.87 No. AC-999-6 / 5 - № 11 15.12.2009 NP.
30 SC-7-87 Collection of prices for project work for construction. Section 7 "Color Metallurgy" (operates with the exception of chapter 1 "zinc, lead, copper smelter, medeelectric and cobal plants", chapter 2 "Nickel-cobalt plants", chapter 6 "redistribution and trains production of rare metals and semiconductor materials", chapters 3 "aluminum and electrode industry ") Order of Rosstroy dated 04.20.2007 No. 110, a letter of the USSR State Building on the introduction of 27.02.87 No. AC-1003-6 / 5 - № 20 dated 12/15/2009 NP.
31 SC-9-87 Collection of prices for project work for construction. Section 9 "Chemical Industry" (operates with the exception of chapters 3 "Supplies of synthetic resins and plastic masses", 4 "sub-separations: fiberglass and fiberglass. Processing of products from plastic masses", 5 "sub-sector of chemical fibers and threads", 6 "oxygen subproduction" , 9 "Supplies of chemical reagents and specialist substances", 11 "sub-sector of varnishes and paints", 12 "sub-sectoral of household chemical goods", 13 "methanol subproduction") Order of Rosstroy dated 04.20.2007 No. 110, a letter of the USSR State Building on the introduction of 25.02.87 No. AC-932-6 / 5 - № 23 dated 12/15/2009 NP.
32 SC-11-87 Collection of prices for project work for construction. Section 11 "Energy Engineering" - № 28 dated December 15, 2009 NP.
33 SC-1-87 Collection of prices for project work for construction. Section 1 "Electric Power Product" (with the exception of chapter 1 "Atomic, thermal and diesel power plants and boiler rooms", chapters 2 "Heat networks and special installations of thermal networks", chapters 3 "separate hydraulic structures of power plants and boiler houses", paragraphs of chapters 4 - 9 concerning Definitions of the value of the design work "Electric Lines of 110-750 kV", chapter 10 "Electric lines with voltage to 20 kV, transformer substations, distribution and partitioning points with voltage up to 20 kV, relay protection, automation and electrical network calculations up to 20 square meters. Electric networks of cities and towns ", chapters 11" Cable power lines ", chapters 12" Hydraulic and hydroaccumulating electrical stars ") Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 17.02.87 No. AH-763-6 / 5 - № 10 15.12.2009 NP.
34 SC-10-87 Collection of prices for project work for construction. Section 10 "Production of mineral fertilizers" (operates with the exception of chapters II "production of the main chemical industry - mineral fertilizers", III "production of nitrogen fertilizers and products of organic synthesis", IV "production of chemical plant protection" and V "buildings and structures manufacturing, auxiliary and public appointment ") Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 27.02.87 No. AC-1004-6 / 5 - № 24 dated 12/15/2009 NP.
35 SC-12-87 Collection of prices for project work for construction. Section 12 "Heavy and Transport Mechanical Engineering" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 17.02.87 No. ACH-758-6 / 5 - № 29 dated December 15, 2009 NP.
36 SC-13-87 Collection of prices for project work for construction. Section 13 "Electrical Industry" - No. 30 dated December 15, 2009 NP.
37 SC-14-87 Collection of prices for project work for construction. Section 14 "Chemical and Oil Engineering" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 17.02.87 No. AH-760-6 / 5 - № 31 dated 12/15/2009 NP.
38 SC-15-87 Collection of prices for project work for construction. Section 15 "Machine-tool and Instrumental Industry" - № 32 dated December 15, 2009 NP.
39 SC-16-87 Collection of prices for project work for construction. Section 16 "Industry for the production of products of general engineering use" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 09.03.87 No. AC-1158-6 / 5 - Number 33 dated December 15, 2009 NP.
40 SC-17-87 Collection of prices for project work for construction. Section 17 "Instrument-making" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-646-6 / 5 - № 34 dated December 15, 2009 NP.
41 SC-18-87 Collection of prices for project work for construction, section 18 "Automotive and Bearing Industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-645-6 / 5 - № 35 dated December 15, 2009 NP.
42 SC-19-87 Collection of prices for project work for construction. Section 19 "Tractor and Agricultural Engineering" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-641-6 / 5 - No. 36 dated December 15, 2009 NP.
43 SC-20-87 Collection of prices for project work for construction, section 20 "Mechanical engineering for animal husbandry and feeding" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-638-6 / 5 - № 37 of 12/15/2009 NP.
44 SC-21-87 Collection of prices for project work for construction. Section 21 "Construction, Road and Communal Mechanical Engineering" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-625-6 / 5 - Number 38 dated 12/15/2009 NP.
45 SC-23-87 Collection of prices for project work for construction. Section 23 "Repair enterprises of the coal industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.87 No. AC-629-6 / 5 - № 39 dated 12/15/2009 NP.
46 SC-24-87 Collection of prices for project work for construction. Section 24 "Plants for the repair of rolling stock, switch and electrical" Order of Rosstroy dated 04.20.2007 No. 110, the letter of the USSR State Building on the introduction of 11.02.87 No. AC-633-6 / 5 - № 40 of 12/15/2009 NP.
47 SC-25-87 Collection of prices for project work for construction. Section 25 "Plants of construction metal structures" Order of Rosstroy dated 04/20/2007 No. 110, Resolution of the USSR State Building on Action on 20.03.87 No. 63 - № 41 of 12/15/2009 NP.
48 SC-26-87 Collection of prices for project work for construction. Section 26 "Forest and Woodworking, Cellulosic and Paper Industry" (operates with the exception of chapters 5 and 6) Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of on 02/16/1987 No. ACH-727-6 / 5 - № 44 dated 12/15/2009 NP.
49 SC-33-87 Collection of prices for project work for construction. Section 33 "Forestry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 25.02.1987 No. AC-928-6 / 5 - № 45 dated 12/15/2009 NP.
50 SC-28-87 Collection of prices for project work for construction. Section 28 "Easy and Textile Industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 16.02.1987 No. AC-733-6 / 5 - № 49 dated 12/15/2009 NP.
51 SC-29-87 Collection of prices for project work for construction. Section 29 "Fish Industry" Order of Rosstroy dated 04.20.2007 No. 110, a letter of the USSR State Building on the Action No. AC-731-6 / 5 in action of 16.02.1987 - № 50 dated 12/15/2009 NP.
52 SC-30-87 Collection of prices for project work for construction. Section 30 "Medical and Microbiological Industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 25.02.1987 No. AC-931-6 / 5 - № 51 of 12/15/2009 NP.
53 SC-43-87 Collection of prices for project work for construction. Section 43 "Material and Sales and Sales Enterprises" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.1987 No. AC-648-6 / 5 - № 58 dated 12/15/2009 NP.
54 SC-41-87 Collection of prices for project work for construction. Section 41 "Objects of geology" Order of Rosstroy dated 04.20.2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.1987 No. AC-640-6 / 5 - № 59 of 12/15/2009 NP.
55 SC-53-87 Collection of prices for project work for construction. Section 53 "Peat Industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.1987 No. AC-647-6 / 5 - № 60 dated 12/15/2009 NP.
56 SC-58-87 Collection of prices for project work for construction. Section 58 "Local Industry" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building on the introduction of 11.02.1987 No. AC-628-6 / 5 - № 61 of 12/15/2009 NP.
57 SC-61-87 Collection of prices for project work for construction. Section 61 "Gas-cleaning and dusting structures" Order of Rosstroy dated 04/20/2007 No. 110, a letter of the USSR State Building of 17.02.87 No. AC-760-6 / 5 - № 83 dated 12/15/2009 NP.
Regulatory and methodological documents (2 standards). Preparation of project documentation in accordance with the "Regulations on the composition of the section of project documentation and requirements for their content, approved. Decree of the Government of the Russian Federation of 16.02.2008 No. 87"
58 MU-2009. Methodical instructions on the application of reference books of basic prices for project work in construction Registered by the Ministry of Justice of the Russian Federation No. 16686 of 03/23/2010 Order of the Ministry of Regional Development of December 29, 2009 No. 620 № 121 dated 04/02/2010 Methodik
59 MU 2015. Methodical instructions on the procedure for the development of state estimated standards "Reference books of basic prices for project work in construction" № 196 from 06/10/2015 Methodik
State estimated standards of reference books of basic price levels at 01.01. 2001 (24 standard). Preparation of project documentation in accordance with the "Regulations on the composition of the section of project documentation and requirements for their content, approved. Decree of the Government of the Russian Federation of 16.02.2008 No. 87"
60 SBCP 81- 2001-01 State estimated standard "Directory of basic prices for project work in the construction" Territorial planning and planning of territories " from 10/25/2010 № 130 NP.
61 SBCP 81-2001-02 State Estimated Standard "Directory of Basic Prices for Design Works in the Construction of Communication Objects Registered by the Ministry of Justice of the Russian Federation No. 18439 of September 14, 2010 Order of the Ministry of Regional Development of Russia of 28.05.2010 No. 260 from 25.10.2010 № 132 NP KV - Postal Communication
62 SBCP 81-2001-03 State estimated standard "Certificate of basic prices for project work in the construction of" housing and civil construction facilities " Registered by the Ministry of Justice of the Russian Federation No. 18439 of September 14, 2010 Order of the Ministry of Regional Development of Russia of 28.05.2010 No. 260 from 10/25/2010 № 131 NP, KV - unique objects
63 SBCP 81-2001-04 State estimated standard "Directory of basic prices for project work in the construction of" Aviation Industry Objects " Recognized as not in need of state registration Letter of the Ministry of Justice of Russia dated January 18, 2012 No. 01/2311-ve Order of the Ministry of Regional Development of Russia of November 29, 2011 No. 547 of 01/23/2012 № 163 NP.
64 SBCP 81-2001-05 State estimated standard "Directory of basic prices for project work in the construction" Regulations for the preparation of technical documentation for the overhaul of buildings and buildings of housing and civilian purposes " Recognized as not in need of state registration Letter of the Ministry of Justice of Russia from 10.05.2012 No. 01/35519-ve Order of the Ministry of Regional Development of Russia of 12.03.2012 № 96 from 05/18/2012 № 171 NP.
65 SBCP 81-2001-06 State estimated standard "Certificate of basic prices for project work in the construction of" Nuclear Energy Objects "(operates with the exception of tables for nuclear power plants with VVER and BN reactors) Recognized as not in need of state registration Letter of the Ministry of Justice of Russia dated 06/28/2012 No. 01/51782-ve Order of the Ministry of Regional Development of Russia of 05/14/2012 No. 198 from 06.07.2012 № 173 Kv.
66 SBCP 81-2001-07 State estimated standard "Certificate of basic prices for project work in the construction of" Communal engineering networks and structures "(operates with the exception of the provisions of chapter 2.8.2 in terms of determining the cost of electric transmission lines with a voltage of 35 - 750 kV and table No. 19 -24, Chapter 2.8. 3 and tables No. 25 - 29, Chapter 2.8.4 - 2.8.5 and Tables No. 30 - 33) Recognized as not in need of state registration letter of the Ministry of Justice of Russia dated 03.07.2012 № 01 / 52444-101 Order of the Ministry of Regional Development of Russia of 24.05.2012 № 213 from 12.07.2012 № 174 NP.
67 SBCP 81-2001-08 State estimated standard "Directory of basic prices for project work in the construction" Oil main pipeline facilities " Recognized not in need of state registration Letter of the Ministry of Justice of Russia dated July 27, 2012 No. 01/59780-Yul Order of the Ministry of Regional Development of Russia of 18.06.2012 № 229 from 08/13/2012 № 179 NP.
68 SBCP 81-2001-09 State estimated standard "Directory of basic prices for project work in the construction" Railways " Order of the Ministry of Construction of Russia of September 30, 2014 No. 590 / PR from 02.10.2014 № 184 NP.
69 SBTP 81-2001-10 State estimated standard "Directory of basic prices for project work in the construction of the Ministry of Defense of the Russian Federation" from 18.11.2014 № 186 NP, KV - Rocket Technology Objects
70 SBTP 81-2001-11 State estimated standard "Directory of basic prices for project work in the construction" Objects of the agro-industrial complex, trade and catering " Order of the Ministry of Pressure of Russia of 10/17/2014 No. 634 / PR from 18.11.2014 № 185 NP.
71 SBTP 81-2001-12 State Estimated Standard "Directory of Basic Prices for Design Works in the Construction of" Civil Aviation Objects " from 03/03/2015 № 189 NP.
72 SBCP 81-2001-13 State estimated standard "Directory of basic prices for project work in the construction" Objects of the oil refining and petrochemical industry " Order of the Ministry of Pressure of Russia from 02.27.2015 No. 140 / PR from 03/03/2015 № 190 NP.
73 SBCP 81-2001-17 State estimated standard "Directory of basic prices for project work in the construction" Water supply and sewage facilities " from 03/03/2015 № 191 NP.
74 SBCP 81-2001-14 State estimated standard "Directory of basic prices for project work in the construction" Gas equipment and gas supply of industrial enterprises, buildings and structures " Order of the Ministry of Pressure of Russia from 02.27.2015 No. 140 / PR from 03.03.2015 № 192 NP.
75 SBCP 81-2001-16 State estimated standard "Directory of basic prices for project work in the construction of" artificial structures " Order of the Ministry of Pressure of Russia from 02.27.2015 No. 140 / PR from 03.03.2015 № 193 NP.
76 SBCP 81-2001-15 State estimated standard "Directory of basic prices for project work in the construction" Bulbated structures and structures, water supply, anti-ridicular structures and events " Order of the Ministry of Pressure of Russia from 02.27.2015 No. 140 / PR from 03/03/2015 № 194 NP.
77 SBTP 81-2001-18 State estimated standard "Directory of basic prices for project work in the construction of" objects of ferrous metallurgy " Order of the Ministry of Pressure of Russia from 02.27.2015 No. 140 / PR from 03/03/2015 № 195 Kv.
78 SBCP 81-2001-20 State estimated standard "Directory of basic prices for project work in the construction" zinc, lead, copper-smelting, tin, medeelectric and nickel-cobalt plants " Order of the Ministry of Construction of Russia of 04.06.2015 No. 406 / PR 06/10/2015 № 197 NP.
79 SBCP 81-2001-19 State estimated standard "Directory of basic prices for project work in the construction of enterprises of transport, storage of petroleum products and gas stations" Order of the Ministry of Construction of Russia of 04.06.2015 No. 406 / PR from 10.06.2015 № 198 NP.
80 SBCP 81-2001-21 State estimated standard "Certificate of basic prices for project work in the construction" Objects of use of atomic energy " Order of the Ministry of Construction of Russia of 09.09.2015 No. 648 / PR from 14.09.2015 № 199 NP.
81 SBCP 81-2001-22 State estimated standard "Directory of basic prices for project work in construction" Automated technological processes management systems (ASUTP) " Order of the Ministry of Construction of Russia dated January 27, 2016 No. 30 / PR from 10.02.2016 № 207 NP.
82 SBCP 81-2001-23 State estimated standard "Directory of basic prices for project work in the construction" Energy facilities. Energy generation " from 10.02.2016 № 208 Kv.
83 SBCP 81-2001-24 State estimated standard "Directory of basic prices for project work in the construction" Energy facilities. Electric grid objects " Order of the Ministry of Construction of Russia dated January 27, 2016 No. 30 / PR from 10.02.2016 № 209 KV, NP - Special calculations and work, Volt
84 SBTP 81-2001-25 State estimated standard "Certificate of basic prices for measurement and examination of buildings and structures" Order of the Ministry of Construction of Russia dated April 25, 2016 No. 270 / from 04/26/2016 № 210 NP.
Sectoral estimated standards for scientific and design work for restoration
1 RNIP 4.05.01-93 Methodical recommendations for determining the value of scientific and design work for restoration of real estate monuments of history and culture Order of the Ministry of Culture of Russia dated December 29, 1993 No. 810; Orders of the Ministry of Taking Russia from 03.06.2015 № 395 / PR, from 06/28/2016 No. 465 / PR
2 SCNP-91. Collection of prices for scientific and design work on historical and cultural monuments. General part, sections 1, 2, 3, 5, 6, 7, 8, 9 Order of the Ministry of Culture of the USSR from 05.11.1990 No. 321; Orders of the Ministry of Taking Russia from 03.06.2015 № 395 / PR, from 06/28/2016 No. 465 / PR Registry data from 01/31/2017 Turning on the registry until 12/15/2016
3 SCNP-91. Collection of prices for scientific and design work on historical and cultural monuments. Sections 4, 10 Order of the Ministry of Culture of the USSR of October 25, 1991 No. 286; Orders of the Ministry of Taking Russia from 03.06.2015 № 395 / PR, from 06/28/2016 No. 465 / PR Registry data from 01/31/2017 Turning on the registry until 12/15/2016
4 SCNP-91. Collection of prices for scientific and design work on historical and cultural monuments. Section 11 Drawing up primary accounting documentation for real estate monuments of history and culture Order of the Ministry of Culture of Russia of 04.02.1992 No. 50; Orders of the Ministry of Taking Russia from 03.06.2015 № 395 / PR, from 06/28/2016 No. 465 / PR Registry data from 01/31/2017 Turning on the registry until 12/15/2016
5 SCNP-91. Collection of prices for scientific and design work on historical monuments of history and culture (SCRPR-91-12). Section 12. Order of the Ministry of Culture of Russia from 05.11.1990 No. 321; Orders of the Ministry of Taking Russia from 03.06.2015 № 395 / PR, from 06/28/2016 No. 465 / PR Registry data from 01/31/2017 Turning on the registry until 12/15/2016

Appendix 2.

Indices change the value of design work due to inflation processes, published quarterly by the Ministry of Internal Affairs of Russia

table 2

No. p / p Period Index size No. and the date of the letter of Gosstroy (Messtroy, Rosstroy, Ministry of Instruction, Ministry of Regional Development) of Russia
1 2 3 4
1993
1 I quarter 18 Temporary recommendations for the definition of basic prices for design work for construction in the conditions of a market economy, taking into account inflationary processes (Appendix 1 to the letter of the Ministry of Economy of Russia dated December 17, 1992 No. BF-1060/9)
2 II quarter 2.5 (2.5x18 \u003d 45) 9-1-2 / 59 dated April 13, 1993
3 III quarter 4.9 (4.9x18 \u003d 88.2) 9-1-2 / 143 dated 09.07.93
4 IV quarter 9.9 (9.9x18 \u003d 178.2) 9-1-2 / 209 of 07.10.93
1994
5 I quarter 16.8 (16.8x18 \u003d 302.4) 9-1-2 / 3 of 06.01.94
6 II quarter 31.9 (31.9x18 \u003d 574.2) 9-1-2 / 69 dated 07.04.94
7 III quarter 41.2 (41.2x18 \u003d 741.6) 9-1-2 / 105 dated 27.06.94
8 IV quarter 50.9 (50.9x18 \u003d 916.2) 9-4 / 140 from 06.10.94
1995
9 I quarter 69.9 (69.9x18 \u003d 1258.2) 9-4 / 1 dated 04.01.95.
10 II quarter 98.9 (98.9x18 \u003d 1780.2) 9-4 / 63 dated 29.03.95
11 III quarter 2,16 (2,16x1000 \u003d 2160) 9-4 / 116 dated 04.07.95
12 IV quarter 2.54 (2.54x1000 \u003d 2540) 9-4 / 151 dated 04.10.95
1996
13 I quarter 2.83 (2.83x1000 \u003d 2830) 9-4 / 3 of 04.01.96
14 II quarter 3.24 (3,24x1000 \u003d 3240) 9-4 / 39 dated 03.04.96
15 III quarter 3.41 (3,41x1000 \u003d 3410) 9-4 / 78 dated 02.07.96
16 IV quarter 3.49 (3,49x1000 \u003d 3490) 9-4 / 106 dated 04.10.96
1997
17 I quarter 3.68 (3,68x1000 \u003d 3680) 9-4 / 2 dated 08.01.97
18 II quarter 3.87 (3,87x1000 \u003d 3870) 9-4 / 36 dated 16.04.97
19 III quarter 3.97 (3,97x1000 \u003d 3970) 9-4 / 67 dated 07.07.97
20 IV quarter 4.06 (4.06x1000 \u003d 4060) 9-1-1 / 114 from 06.10.97
1998 9-1-1 / 6 dated 13.01.98
21 I quarter 4,15 9-4 / 10 dated 19.01.98
22 II quarter 4,35 9-1-1 / 60 dated 07.04.98
23 III quarter 4,46 9-4 / 89 dated 07.07.98
24 IV quarter 5,27 BE-178 from 05.11.98
1999
25 I quarter 5,27 AT-588 dated December 28, 1998
26 II quarter 5,56 BE-1043/10 dated 01.04.99
27 III quarter 5,9 AT-2194/10 from 30.06.99
28 IV quarter 6,46 AS-3412/10 from 07.10.99
2000
29 I quarter 6,8 AS-6/10 dated 05.01.00
30 II quarter 6,93 ASh-1636/10 dated 19.04.00
31 III quarter 7,04 AS-3648/10 dated 21.08.00
32 IV quarter 7,33 ASh-4440/10 dated 09.10.00
2001
33 I quarter 7,71 ASH-9/10 dated 04.01.01
34 II quarter 8,06 AS-1691/10 dated 04/05/01
35 III quarter 8,48 ASH-3623/10 dated 04.07.01
36 IV quarter 8,62 ASH-5360/10 from 03.10.01
2002
37 I quarter 9,12 AS-32/10 dated 08.01.02
38 II quarter 9,77 ASh-1717/10 dated 04.04.02
39 III quarter 10,19 ASH-3981/10 dated 19.07.02
40 IV quarter 10,38 AS-5844/10 of 09.10.02
2003
41 I quarter 10,64 NK-70/10 dated 09.01.03
42 II quarter 10,96 SK-2144/10 dated 04/04/03
43 III quarter 1, 46 to the level of prices on 01.01.01 11.28 to the level of prices on 01.01.95 SK-4107/10 dated 07.07.03
44 IV quarter 1, 50 11, 59 SK-6291/10 dated October 10, 2003
2004
45 I quarter 1, 54 11, 9 SK-91/10 dated 09.01.04
46 II quarter 1,6 12,37 SK-2206/10 dated 07.04.04
47 III quarter 1,64 12,67 AR-722 dated 27.07.04
48 IV quarter 1,68 12,97 IM-1312 of 10/22/04
2005
49 I quarter 1,73 13,38 500-BG / 70 dated February 14, 2005
50 II quarter 1,81 13,96 2586-MP / 70 dated 27.05.2005
51 III quarter 1,87 14,42 4078-VA / 70 dated 25.07.2005
52 IV quarter 1,93 14,89 SK-4714/02 dated November 10, 2005
2006
53 I quarter 1,99 15,35 SK-280/02 dated 01.02.2006
54 II quarter 2,08 16,04 SK-1524/02 dated 04/21/2006
55 III quarter 2,13 16,42 SK-2843/02 dated July 10, 2006
56 IV quarter 2,16 16,67 SK-4250/02 dated 09.10.2006
2007
65 I quarter 2,19 16,92 SK-184/02 dated January 23, 2007
66 II quarter 2,23 17,21 SK-1394/02 dated 09.04.2007
67 III quarter 2,27 17,51 VK-2766/02 dated 07.23.2007
68 IV quarter 2,39 18,40 SK-3742/02 dated 09.10.2007
2008
69 I quarter 2,48 19,06 WB-5/02 dated January 9, 2008
70 II quarter 2,58 19,85 WB-1302/02 dated 04.04.2008
71 III quarter 2,69 20,70 16568-SK / 08 dated 09.07.2008
72 IV quarter 2,76 21,25 26064-SK / 08 of 14.10.2008
2009
73 I quarter 2,83 21,83 3652-SK / 08 of 12.02.2009
74 II quarter 2,97 22,87 10217-SK / 08 dated 09.04.2009
75 III quarter 3,03 23,36 21713-SK / 08 of 13.07.2009
76 IV quarter 3,08 23,72 33498-SK / 08 of 13.10.2009
2010
77 I quarter 3,05 23,49 1289-SK / 08 of 01/20/2010
78 II quarter 3,05 23,49 22030-W / 08 dated 05/26/2010
79 III quarter 3,13 24,08 28203-KK / 08 dated 07/26/2010
80 IV quarter 3,13 24,08 39160-KK / 08 of 11/18/2010
2011
81 I quarter 3,13 24,08 4511-KK / 08 of 02.03.2011
82 II quarter 3,19 24,56 15076-KK / 08 dated 06/09/2011
83 III quarter 3,27 25,20 18769-Ap / 08 of 07/15/2011
84 IV quarter 3,31 25,53 30394-IP / 08 of 07.11.2011
2012
85 I quarter 3,35 25,81 4122-IP / 08 of 28.02.2012
86 II quarter 3,42 26,35 10837-IP / 08 dated 04.05.2012
87 III quarter 3,46 26,67 23167-Ap / 08 dated 03.09.2012
88 IV quarter 3,53 27,19 2836-IP / 12 / GS dated 12/03/2012
2013
89 I quarter 3,58 24,08 1951-W / 10 dated 12.02.2013
90 II quarter 3,60 27,77 9912-cd / 10 dated 07.06.2013
91 III quarter 3,64 28,05 13478-CD / 10 dated 07.29.2013
92 IV quarter 3,64 28,05 21331-SD / 12 / GS dated November 12, 2013
2014
93 I quarter 3,64 28,05 3085-EU / 08 of 28.02.2014
94 II quarter 3,64 28,05 8367-EU / 08 of 05/15/2014
95 III quarter 3,70 28,50 15285-EU / 08 of 04.08.2014
96 IV quarter 3,70 28,50 25374-JUR / 08 of 11/13/2014
2015
97 I quarter 3,73 28,73 3691 LAN / 08 of 12.02.2015
98 II quarter 3,73 28,73 19823-JUR / 08 of 06/26/2015
99 III quarter 3,84 29,59 25760-JUR / 08 of 08/13/2015
100 IV quarter 3,84 29,59 35491-VM / 05 of 03.11.2015
2016
101 I quarter 3,92 30,17 4688-hm / 05 dated 19.02.2016
102 II quarter 3,92 30,17 17269-Hm / 09 dated 03.06.2016
103 III quarter 3,92 30,17 31523-Hm / 09 dated 09/27/2016
104 IV quarter 3,95 30,43 41695-hm / 09 dated 09.12.2016
2017
105 I quarter 3,99 30,77 8802-hm / 09 dated 03/20/2017

Overview of the document

The explanations on the use of a collection of prices and reference books of basic prices for project work for construction (2012-2017).

They can be useful to developers (customers), contractors in all. In the formation of the initial (maximum) price of project work.

Thus, explanations to the definition of the basic price of design work for the construction of housing and civilian facilities, fire-fighting and security systems, artificial structures, road transport enterprises are given.

Introduction
I explanations for the definition of the basic price of design work for the construction of housing and civil facilities
1. Question: How to calculate the cost of developing project documentation for the construction of a sixteen-storey residential building and a residential building of different floors (10, 14, 16 floors)?
2. Question: What is the procedure for determining the cost of developing a basic block section for multiple (more than 3 months) application?
3. Question: How to develop project documentation of the individual block section in a mirror image in relation to basic?
II Energy Objects
1. Question: How to determine the cost of designing facilities on the price indicators of the directory of basic prices for project work for the construction of "Energy Objects" ed. 1996 (SBC 1996)?
III furnaces of ferrous metallurgy
1. Question: How to determine the relative value of the CIPIA section?
IV water supply and sewage facilities
1. Question: How to determine the cost of designing a water dweller with a length of 0.1 km and consumption from 300 to 1000 m3 / h?
V General use roads and urban engineering facilities and communications
1. Question: What is understood under construction site in relation to a linear object (road or outdoor lighting line)?
VI Artificial facilities
1. Question: How to determine the basic price of designing bridge structures with a length of 900 to 1800 m?
VII gas equipment and gas supply of industrial enterprises, buildings and structures. OUTDOOR LIGHTING
1. Question: How to calculate the cost of developing working documentation of outdoor coverage of a section of 17 km long?
2. Question: How to distribute the cost of design work in the design stages when applying the LC 2006?
VIII Objects of Main Transport Oil
1. Question: How to determine the cost of developing project and working documentation for the cutting of the pipeline to the operating oil pipeline?
2. Question: What are the work taken into account by complex LSA-2007 prices?
3. Question: Determining the costs associated with the design of lightning protection, grounding and lighting?
4. Question: How to determine the cost of developing partitions "Evaluation of the impact of the object of capital construction on the environment", as well as "environmental protection measures" in the National Security Committee?
IX Objects of the oil refining and petrochemical industry
1. Question: How to identify foams on the design of individual point objects of the oil refining and petrochemical industry?
X explanations to determine the cost of other design or related work design
1. Question: Are there currently general instructions on the application of the reference books of basic prices for project work for construction approved by the decision of the Russian State Building of 07.08.02 No. 102?
2. Question: What coefficients are priority: given in guidelines or in the LC?
3. Question: How is the basic price of design work calculates if the design object is less than a double minimum indicator given in the reference table?
4. Question: What coefficients belong to the pricing, and which are complicating in accordance with new methodical instructions?
5. Question: How to use coefficients to bind typical or reused project documentation?
6. Question: How to apply an increase in the coefficient for uniqueness?
7. Question: What is the procedure for determining the cost of project work on the reconstruction of existing enterprises, shops, buildings and structures?
8. Question: Is it possible to use the "temporary standing time of the design" CH 283-64?
9. Question: What is the procedure for determining the price of the development of technical documentation on the overhaul of facilities in accordance with the new methodological instructions?
10. Question: How to apply the coefficient to reduce design timing?
11. Question: What are the main functions of the general designer?
12. Question: What is the procedure for determining the costs of project organizations related to the implementation of the functions of the general designer and overseeing design work transmitted to a subcontract under new methodical instructions?
13. Question: How to determine the ratio of the cost of developing project and working documentation for sections of a collection of prices for project work for construction, prices in which are established to develop work documentation?
14. Question: Who is the development of technological regulations?
15. Question: How to determine the costs of developing a project organization for the construction of the object?
16. Question: What indices should be used when determining the value of measurement and examinations of buildings and structures, including their building structures?
17. Question: How to determine the cost of designing electrical heating systems of equipment?
18. Question: How to determine the costs of a project organization related to the protection of project documentation in expert and asserting instances?
19. Question: How to determine the cost of paying for accounts of organizations conducting coordination and examination of project documentation?
20. Question: How to apply deflator indices?
21. Question: How to determine the costs associated with the performance of work on the impact of the object of capital construction on the environment (EIA)?
Appendix 1 Indices to product prices
Appendix 2 Order approval of reference books of basic prices for project work in construction

Gosstroy Russia

Federal State Unitary Enterprise
Center for Scientific Methodological Supply of Engineering
Maintaining investment in construction

FSUE "Centrinvestproekt"

Collection of clarification
On the use of price collection
And basic price directories
For project work for construction

(QUESTIONS AND ANSWERS)

I. Explainations to determine the value of pre-project work

1. Question: How is the cost of the work on the choice of land plot (routes) for construction?

Answer: The choice of land plot (routes) for construction is carried out, as a rule, when developing substantiations of investment in the construction of the facility.

In determining the cost of developing substantiations of investments in the construction of the object costs of design organizations related to their participation in the choice of land plot (routes), are accounted for at this price.

In cases where, when developing substantiations of investment in the construction of an object, the choice of land is not fulfilled, the basic price of investment justification should be adjusted using the correction coefficient as execution of work in abbreviated, against the extent of the current regulatory documents.

The cost of the costs associated with the implementation of these works is given in practical manuals on the application of reference books of basic prices for design work for construction and can be up to 5 % from project development price.

2. Question: How is the calculation of the application (declaration) on the intentions of investing in the construction of enterprises, buildings and structures?

The need to perform work on interiors in the amount exceeding the SNiP requirement should specifically be specified in the design task.

30. Question: As is taken into account in prices for design work, determined by the directory of basic prices for project work for construction "Objects of housing and civil construction"ed. 1994, the need to develop as part of the automation project documentation:

· thermal nodes and points when installing heat meters in them;

· supply and exhaust ventilation systems;

· sewage valves, water supply and sewage pumps?

Answer: Basic price determined by the directory of basic prices for project work for construction "Objects of housing and civil construction"edition 1994,mounted depending on the total cost of construction, the cost of designing the entire complex of buildings, structures and types of design work, which is included in the consolidated estimated calculation of the cost of construction, including the automation systems of engineering nodes of buildings and structures.

At the same time, the indicators of the relative cost of development of the project documentation provided in the tables of manual to determine the relative value of the development of project documentation on housing and civil construction facilities are purely approximate and can be determined by the Institute independently within the established total price depending on the complexity of the work.

31. Question: Whether the cost of designing automatic fire extinguishing, fire and security alarms has been taken into account when determining the basic prices on the current sections of a collection of prices for project work for construction (publication 1987-90.)?

Answer: When determining the basic prices for project work on the current sections of a collection of prices for project work for the construction of publication 1987-90.the cost of designing automatic fire extinguishing, fire and security alarm systems is determined additionally to the price for the development of project documentation for the construction of enterprises, buildings and structures (see paragraph 2.10 of temporary recommendations for the definition of basic project work for construction. Appendix No. 1 to the letter of the Ministry of Construction of Russia from December 17, 1992No. BF-1060/9).

Complex prices of reference books of basic prices for project work for the construction of publication 1994-98the cost of designing fire and security systems is taken into account. In this regard, the specified work is not subject to additional payment.

32. Question: What price document is determined by the cost of designing systems of fire and security protection of enterprises, buildings, structures?

Answer: The cost of designing automatic fire extinguishing installations and fire alarms of enterprises, buildings and structures is recommended to determine on the reference book of basic prices for design work for the construction of a "fire and security protection system", which is approved and recommended for the application by letter of the Russian state system of September 28, 1999. No. NZ-3287/10.

With the introduction of the specified directory loses force section 60 "Automatic fire extinguishing, fire and security alarm installations"Collection of prices for project work for the construction of publication 1987-90 gg

This directory is used to determine the basic price of designing systems of fire and security protection of enterprises, buildings, structures only when performing these works on a separate task for design.

33. Question: What coefficients in the directory of the basic prices for project work for construction "Fire and Security Protection Systems"(Edition 1999)refer to the pricing, and what - to those accounting for complicating factors?

Answer: In the "Fire and Security Protection" reference book, the coefficients that make complicating factors are provided for by paragraphs. , Chapter 2 "The procedure for determining the basic prices for project work" and paragraph 2 of the notes to Table 6, all other belong to the pricing.

34. Question: For what valid sections of a collection of prices for project work for the construction of publication 1987-90.can I determine the cost of designing thermal points for residential and civil buildings?

Answer: The cost of designing thermal points is not taken into account in the price of the section 39 "Residential and Civil Buildings"Collection of prices for project work for the construction of publication 1987-90.and can be determined additionally according to other sections of the price collection - 6; 9; 10.

35. Question: How is the basic price of developing project documentation of heat-resistant (TP and TSP) of low productivity?

Answer: Due to the lack of a collection of prices from the sectoral section of the "electric power". 1987-90.and the directory of the basic prices for project work for construction "Energy facilities"ed. 1996prices for the design of TP and CTP, to determine the price of the specified work, you can use the section 9 "Chemical Industry"Collection of prices ed. 1990taking into account changes and additions (Table 9-14. p. 100) with the introduction of correction coefficients in accordance with paragraph 18 of the instructions for the application of the price of the section ("for chapter 14:

· The indicator is less than a minimum of more than 2-4 times - 0.7;

· With the indicator less than the minimum more than 4 times - 0.6).

36. Question: How is the cost of designing beguarding?

Answer: A reference book of basic prices for design work may be applied to calculate the basic price of design work for construction for construction "Objects of river transport"edition 1995 year or section 54 "River Transport"Collection of prices of publication 1990 year, bearing in mind that the introduction of the reference books of basic prices, in which prices are established depending on the cost of construction, does not provide for the abolition of the relevant sections of the price collection. In this case, the application of documents of a later edition is preferable, i.e. Basic price reference books in terms of modern requirements for the development of high-quality project documentation.

37. Question: How can I calculate the base price of the design of the overpass for passing trams and metropos?

Answer: Due to the absence in the directory of basic prices for project work for construction {!LANG-075e2a679f5bc898974b2d528abfb83e!}{!LANG-2b78ce2cf8ade55072da1a0e9596238e!} {!LANG-2a239b33c5af2aaa76cb602a41f81c94!}{!LANG-d6637aeea8d9152726a4b75e7ae477eb!}

{!LANG-bae44db4f4961651290296df5f26ddb7!} {!LANG-385c43de0bf8fec62c95922bf800dc3f!}{!LANG-c12d99fdc078d38a8b8b5ef13c80b10c!}

{!LANG-ca3902de37a8f0364e1b66606f1ec386!}

{!LANG-c024fcc2736e4b140d358c0d9bf219f9!} 25 {!LANG-720c182a59ad86dc90879ddabe3b6057!} {!LANG-b5863420c1928e5c75174918b1336d3c!}{!LANG-064a313bcfc4b60f7e615eaa104adb72!} 25 {!LANG-6168d3ad87581b95acb61fb6ff95eb0b!}

{!LANG-e4fa526e373b4ed14c8c9f58c76cec0b!} 5 {!LANG-859d7da96fa6f9dd6bbb774da1865bd2!} 3 ).

{!LANG-02200a155fc5a894afdee3a5554c4e7b!}

{!LANG-6e3d5655642779bc73059ec84cb90f4e!}

{!LANG-f7770915e5693df10277a941231d4cf1!}

{!LANG-1a328ff198dcf72ed717be44e37ef6c9!} 90 {!LANG-8f0431f1388c55c2c38d43388055a36c!}

{!LANG-08b3e8cae9506d39985fc506f5a66206!} {!LANG-9f1ec25c3e9e99bc593e97c0c45a916d!}

{!LANG-ab8e505048f29d3abd17517b71412b32!} 0,5, {!LANG-5407bf94cfd3f549879bf52c9f372236!}

{!LANG-d6928d30aae3a0d4b314c13f3e06622c!}

{!LANG-029b36cd5d75dce840a3a76bae6ff0b0!} {!LANG-6d98977f37ffff1bbf3da614234ea699!}{!LANG-21ad2e4742384db99dbbc88b22b10234!} {!LANG-8b9e8ec006a305d1844ca9a1d386fb9a!}{!LANG-22d4a805c3fca64595405751e24d4778!}

{!LANG-d7bb50fbb16d1abec6a411975f42d5a9!}

{!LANG-927f05e8624e69db6c9df509942a3304!}

{!LANG-8507e568b383969cdbce83ba78c8ac54!}

{!LANG-a71213ff121d47bf791269cfc36c4b02!}

{!LANG-f10252afa3b0be06525bfa09b933adf3!}

Appendix 1

{!LANG-cd8bccf3d035a473d315451873aebdfe!}
{!LANG-e345810d08745767fe699314c856d3a4!}
{!LANG-2aaaf47ff1d56b39d22d26ac1bcccb95!}
{!LANG-ea2ee2eee93e10ff00cae1f8c8294b39!}
{!LANG-ae86245f77287817cbfc34f043b60bfc!}

{!LANG-f0eddbbd6ef6d575d176d0ae5dcf07d4!}

{!LANG-0933bc20e4bf956074c7d09a39f2ca02!}{!LANG-9d0d77e5ba1f639c0ce86930a0406ea0!} {!LANG-d27b8d79f5cf6f6903ea957c68038ffe!}

{!LANG-6b5a792861ec0495c79093aeed5bed97!}{!LANG-455f7c6dde2a63c6b48166a0b41b190c!} {!LANG-5d103d8ddbeb6c1fa8a8fc5cb8af8018!}

{!LANG-3ab571596e04ca071bd3ea1d1a4067fc!}{!LANG-e0d4bd607c53d4c8a09d09bebe2df231!}

{!LANG-87db185069dc5c7073dfdc7943207368!}{!LANG-c8da87be4bec002445327feda368d2c0!}

{!LANG-c2f073834dbefc421602f89c33988a6e!}

{!LANG-3c42b93cd398679103be2975db228311!}

{!LANG-36d3dbaaceea9a0a059bf8c34368cda3!}

{!LANG-691f38a0bd88c75fe8f455fde0c63e2a!}

{!LANG-5abf789c12cd3827e6501d08ca8c95c9!}

{!LANG-168106b9a5f0377323ea0bb0f7585583!}

{!LANG-4a904c354782d0998999220e42d90668!}

{!LANG-7b60009de2ee7e62c5cc525be7e71493!}

{!LANG-48363c564aa7a50304fbc08adfa54775!}

{!LANG-4dff0f904a68ade4117568a61cd46783!}

{!LANG-f99b10c6ea143f373c82ca06ff3c0c03!}

{!LANG-82dd94b639444a15e721095bf23451a2!}

{!LANG-1979050ecace9f0c2596c1ee5906a108!}

{!LANG-7f6b9cf74242e78027cac01a344e6009!}

{!LANG-603787d4b0fa20fac671e0fb8a4d9129!}

{!LANG-62e2c12f4b64d64fac407fc8787849ee!}

{!LANG-9f2faad17c9ef7f387313ef2e885345a!}

{!LANG-08735b8a00a9ffde51ce4c916cfabcc6!}

{!LANG-b90d6b99d7d792afa899e2c234e0409f!}

{!LANG-201abe0d48e19af40071dc8b085355b0!}

{!LANG-97c9eceb9e978b3af344392418f7fa87!}

{!LANG-8fd6f91993b6830515b4072165277750!}

{!LANG-c1aa8b1299d2dfff23664053d2bbd182!}

{!LANG-7a8139a57313f0d54188d47763487479!}

{!LANG-22a4295d52459938822bdcfabf943681!}

{!LANG-0e1ac65e964f484b093d61d548fa0b23!}

{!LANG-02449f3fe9752a152d05e0a4226f9545!}

{!LANG-1d38387966ff6f854c88f54d70e0e122!}

{!LANG-50d4d3adec75bf6c2ec149de46deaa74!}

{!LANG-6b15daa20b022efde26a0ebf2a7e66f1!}

{!LANG-4d4cc39a997aabf9e821cb9f8754587e!}

{!LANG-e1d8f3d86e95b1654039e194467c06c0!}

{!LANG-eace5e55f16690765772c05cf50a9f7e!}

{!LANG-cc749c187d1a058bfc460c910b23cfbd!}

{!LANG-15e480e872025b16ce090234ab5f32a0!}

{!LANG-aea84f6d81d15c49aceb9beb43bb87af!}

{!LANG-afe96af1208eadbacd4d0958d9266e25!}

{!LANG-3cab7db78e3111e4474b7df210a8efee!}

{!LANG-8994b825ae5a3d1517cbc6d28846a45b!}

{!LANG-208268c11e1ddbd1942ea79c2dd097a0!}

{!LANG-e49b2094ceb1e83c28dc5b30caea60c3!}

{!LANG-84613684f4f2c31547345442b342b241!}

{!LANG-c8261f0aba2f54746b0b08498a329981!}

{!LANG-9e92563fccd1ae54cf0d4977fc24c1ea!}

{!LANG-ad2de4e699904d7134a11daf5cbb851e!}

{!LANG-0fe0944bf7eff3204dbebd1ca70f32e2!}

{!LANG-a6ee4aed60dc8fd4b86602ce38849953!}

{!LANG-462283b85e109a3318cc884dc84423f7!}

{!LANG-2a43ecae21ac86f36fd5d2063eab004b!}

{!LANG-8ece86269f4a6690b35a19e516e33748!}

{!LANG-0a99a2b8c3263b59894a7a935f001fa5!}

{!LANG-b424601d4c9176187dc20cb4b31a0a78!}

{!LANG-f29df7c48d0d62c01e34d0b7321747a0!}

{!LANG-1a1881811c2740f9e6fc927950eaed9c!}

{!LANG-afc664dd03be7ceb6dc432b629cf6ed4!}

{!LANG-fcde1c8e2c61d06e167a0f4ed52c9e23!}

{!LANG-7c39e5da56b7d80e61067c4dc76cc4d5!}

{!LANG-746b6d4f5863a888a34b7c6b77c411bf!}

{!LANG-e1a9c9722f50a4db00f1dc2bbebe75e6!}

{!LANG-1a4dceec00c59b05865ff327b074da53!}

{!LANG-a05d137c0e337188be850fffeb669e73!}

{!LANG-bfba3572c772dd77e38da9620c4c6fbd!}

{!LANG-e50068397e88e7b23cbb9ca832c784db!}

{!LANG-abdda32a5c14a0d7a7e824bdbad7e9a6!}

{!LANG-fe9575b37fa83ed177032ffdd6ff5577!}

{!LANG-9552b6aff92b3c08575cfbd1c506ee5d!}

{!LANG-2e0bf005a7a8e7cda1d43838b090dcd7!}

{!LANG-8d422bd663f13034a0c1e1852e28463f!}

{!LANG-43628bf10b7a53a61a7313e4320ce83a!}

{!LANG-091cd5b13a26b4f235a074227183918b!}

{!LANG-96e3e57786e761e5d3f02eb3013c66cb!}

{!LANG-b88eb81bda3a409f46e3bcebfeea4eba!}

{!LANG-8043310b94ee514796cca6900d1d1fff!}

{!LANG-6e693eaea48903756f8db53a38eaf023!}

{!LANG-0950de4f7b17cf153474c2c0b8c24a5c!}. {!LANG-eb2e498c5ed839ed99c3db2b47b65fe8!}

{!LANG-78ff58f214c48c83976f7a7090a72e92!}

{!LANG-68212bad1f4b395602633ccb40cce628!}

{!LANG-0c1a7c670cb541c371f0415d436288ab!}

{!LANG-95d240082090acc3c991faa8850e2668!}

{!LANG-0d05adf4572c9a3db50b784702863521!}

{!LANG-da2e4b3de7fc31b3dd33de06f18c7552!}

Appendix 2.

{!LANG-413fd0ef5f8cf650325ef334479d84e7!}
{!LANG-11718a91a4c700180ffdca7ac93af404!}

{!LANG-d220a15fa5f7900479d74d60b056bf72!}

{!LANG-aa1c1aa06eb3ca269a7711b191ef6f21!}

{!LANG-ddb8a9025c0f16d9af779fab3f655e61!}

{!LANG-75967b314190834f74bc01f3a305f1d0!}

{!LANG-415f64c0e910a09417f364ae3ce3942d!}

{!LANG-d4d1601a956a8983e8eb93f3ca24b540!}

{!LANG-1693331b845c6f7fc2d101f91f479d5c!}

{!LANG-fa326c08c8103cd49e6a32c93ccdeacd!}

{!LANG-9e264042e42dc561ee64c89595ebe311!}

{!LANG-f0ee479bfb1b145b9eacb6d0bd11e5da!}

{!LANG-989c722f274a6af3af2400492620f62f!}

{!LANG-46484f3ae098a7b0e5d1edf01ee07209!}

{!LANG-92cc3e0bac3f50c70f9172417c7eb1df!}

{!LANG-358fa2576ac8a9a2286beea3edbcbe06!}

{!LANG-0c1c9c8aa2cd3f9cb3a8472e0c7c5ad4!}

{!LANG-373a1042688a22c4870e4c4c613fed24!}

{!LANG-a80002bf4ce264d32f95f9906114ed71!}

{!LANG-62049ff6c31e928fc014f5368ae7a3d4!}

{!LANG-174ba2d697c24c8a78d71109cfeb4d80!}

{!LANG-23940cffa64f9b4c0f1db1ceaf642a2f!}

{!LANG-61e422e67b7c4831a7ca8cf835f80127!}

{!LANG-81443701c078ec82f9105b1451b2c37b!}

{!LANG-269706bdc96f2db650ba75b5ada562fd!}

{!LANG-737862192350492892c234f79fa459dc!}

{!LANG-55f51a6263c9755cb5e2079e5f0f8f1e!}

{!LANG-124b251f87fcc40e6dd7803fa843da09!}

{!LANG-b69f4ff1724e4b6f0b29c5cf882924ab!}

{!LANG-a4061671c50186aedcaaaccff143fcda!}

{!LANG-520ace0f8a8d3e17fa4e8ea4575828f1!}

{!LANG-7f31b60e66d867981413da6389bb50a6!}{!LANG-0b79f322b2fb926da4e098d4f25894d5!}

{!LANG-3427146dd5f2b79482bec7b7cc08f8fb!}{!LANG-faf215a1310f00adf8059100c44d3842!}

{!LANG-18cbc3aca33bf3b14bb1db036e701087!}{!LANG-8a030f096b58f4c91bedea2565c41c03!}

{!LANG-8963100b204d69a6c43430a7d001646c!} {!LANG-17edd5b81cc337b22389995a2c48180c!}{!LANG-d4111801b4f8ada1226dd6acd679e171!}

, {!LANG-3a91ee9fceea871b7a1d62e95e01bd1f!}

{!LANG-4d6e8fbe640c83e860a1b550ae3f64e0!}{!LANG-4bfb6432d7bb214319efc6d48e31988d!} {!LANG-0ad3908944bbe4c48e44cf63a2d61337!}{!LANG-2df33b6dfebe56c1383f6b870fa29022!}

{!LANG-6a96b2a37af6ff599efde5e30d4391e3!}{!LANG-f86ecd788f169c15ac827feb73fed61f!}

{!LANG-ef9e4ca66bff9453a68f8810aadae618!}{!LANG-c662016dc09b557afc65c696f3765395!}

{!LANG-fef671c5608ca196f3d7186cc0b30d75!} {!LANG-08e2ef9d3f81821f87f3c633374b9ec6!} {!LANG-ef9e4ca66bff9453a68f8810aadae618!}{!LANG-73616ed6f6adac8bcdc55dc0e6e86723!}

{!LANG-f07f9e289ea27c04133fea893de8c29d!} {!LANG-e2c5fc7fcc60378e2527f0e2df61a9c9!}{!LANG-03ccc17284210a3f9d300deca4c97ac1!}

*) {!LANG-ef9e4ca66bff9453a68f8810aadae618!}{!LANG-6e3b7c5e9c078238a76b07c363880e36!}

{!LANG-80438f2cced570378eb42c2165fe5e2c!}

{!LANG-331eea14ef3e8180e78b54482a2eb15e!}

{!LANG-01c431ffa9df063907ea40cf5f1784f4!}

{!LANG-e5153d8dca465a2a6468871c457f3ad3!}

{!LANG-caa64e9c3958640b8c9851108fc81c1a!}

{!LANG-9e87a1057e8fbe84307afc4cd184dabf!}

{!LANG-481116e65b392305c1fdad6de2a4ace5!}

{!LANG-370e716d251824e72a544be0510de4d8!}

{!LANG-974a6c6df3c471d5a04296663140b05c!}

{!LANG-c7af806102036328fccabfd11ac38923!}

{!LANG-61741462b6f8c0076c16b65784dbc8fa!}

{!LANG-a6cd4b590c49c7d03b5bb60b99567a86!}

{!LANG-102887148d2c36411545431b9637bbcc!}

{!LANG-e141ece6defbda290bee142a41fcaa1c!}

{!LANG-defa6bd41c919da105286c6b547bdc6e!}

{!LANG-37e8449b6894ed02724ee5432a646117!}

{!LANG-55a848b28ed0eb32024ebd444937be16!}

{!LANG-7cb2bcc51d6f67bedf03cd197ba6f7ad!}

{!LANG-54398ab88a7ce5786d9d61d8e039a793!}

{!LANG-731f95592ce8ccb9ec67959840f4bb21!}

{!LANG-60d0385bd9112f35df462de42070e6f4!}

{!LANG-88b534b3215216fa9265595142ea6ea3!}

{!LANG-e93acd6eb1bdf7174e934b9c44a4f5db!}

{!LANG-4a4d211433ee82f19afb6c69cce780bc!}

{!LANG-93081a9581bd5aa10a32ccf633bd4188!}

{!LANG-cb9c43ee98a0ed44cc94dd2e0f80a85c!}

{!LANG-ad83bbd31b238f19b9e848bcd48216e4!}

{!LANG-48b4749818fb489caa8f512231f315ff!}

{!LANG-bb566162b6632459b573344ffa47b941!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

2,5 {!LANG-dbd8d563dacde1bc5b1e49a5eea45f07!}

{!LANG-3099a0ad8e0623f4f2c074b06bab4f09!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

4,9 {!LANG-a6bc653f2cfcfdb124fa1b519f05d4fe!}

{!LANG-8c76b4473ad73317c4a60210c98c557b!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

9,9 {!LANG-89392d31cf26aca9194d0b7fabb00a93!}

{!LANG-11f77e353728e4a320788ae8c4b6a59f!}

1994

{!LANG-ed9393e1adbcd501973ab327061adecd!}

16,8 {!LANG-754795029db632e38bc79f74164d4997!}

{!LANG-442b31a6bfa17eb6c60b48bf58a2c693!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

31,9 {!LANG-dbe1a12523b6d45c8f47f0338c26ac1d!}

{!LANG-0fd78e0d7acda2d4056747516311b9af!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

41,2 {!LANG-3c0160fc9f80dd40118f63e99077f6b6!}

{!LANG-77ad0e181dda4b532ba5fb728aebf533!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

50,9 {!LANG-ae346f2c0cbea26cc64be46525f15252!}

{!LANG-54838ef5fe434675d0cadd3580d9e0ef!}

{!LANG-489713dab82ae60bab0cdd6fd187250c!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

69,9 {!LANG-203e6767d919ccd253efbde803fdc05e!}

{!LANG-c4e84358fdce633c7f552647519858eb!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

98,9 {!LANG-e7e884cc0e32811d398a0ba850928d09!}

{!LANG-1fabf0cae6325e74b57a1ea89ac98ae7!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

2,16 {!LANG-ee8ff85ec271777d647e4d2b9a0140c8!}

{!LANG-cea26c1d56355d0e3e6fc276e9f0580f!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

2,54 {!LANG-eb38151afa3759ee0d1f3ea2ef206a6e!}

{!LANG-94357789c04f407c47f9e7f6acda6790!}

1996

{!LANG-ed9393e1adbcd501973ab327061adecd!}

2,83 {!LANG-0f0c2354a45e573e32b55b3a55911a10!}

{!LANG-955ff63cf56bc3ad6c863ea43bfdc687!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

3,24 {!LANG-65f47539ba94d29d05814f094781ab01!}

{!LANG-7776275f2d1f12eecb2e4678c2fee47e!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

3,41 {!LANG-44245845af095fdce9f3df4dd2b8c5c5!}

{!LANG-d1f565ec9b3173aecc2a840b5d7fdbff!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

3,49 {!LANG-bd2e72d1900c6684647df0ef6c6e0893!}

{!LANG-fb2bdbb69a922867710cf52fe5e1dd32!}

{!LANG-059625fceb426e051fcd357c203fc015!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

3,68 {!LANG-48d0f671c56dfb981817bed63e8089b4!}

{!LANG-4ad6029363b24d531ecd7099c40393c6!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

3,87 {!LANG-eb434767e4d86177b8dedf4cf7f9dffc!}

{!LANG-5fe72fc7f7129c82daa586a22d052bd8!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

3,97 {!LANG-b6f1f430e9467953ae1247bc07a5b3a1!}

{!LANG-6689bf104c9b4e692c1f06f96c766dc4!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

4,06 {!LANG-98d97b3dcfe6119c2c295b2f048ed67d!}

{!LANG-fd2d0974a5fbe9c8b0af6aca1ed4303d!}

{!LANG-9f1ec25c3e9e99bc593e97c0c45a916d!}

{!LANG-f925a261a233a6afaf85b85b0eab3ad2!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-93b17fbb14038488e34e3a84c3636449!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

{!LANG-a6f5229d3fac774bbe7188c3dd885968!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

{!LANG-39755af3253a3a145edc11097ed83372!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

{!LANG-f0cdf8fefbc0e3dbf8b92d2b5be807b7!}

{!LANG-206770be12ef353bf032b43609535f4a!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-c4147cde8fd4a04ef867ffe83b5023d9!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

{!LANG-13b3f7ae6329019fc610d82131217dca!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

{!LANG-3787af7046d10ffba056ae16f701b70f!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

{!LANG-58f7230bf7620223830ea209c56cdfd0!}

{!LANG-b04ab7028b15f12164757c3d79834ee6!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-ed49c4bfb0871732e24825b7363d5ffb!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

{!LANG-c03e6e948fdc5d15471fea55a766a753!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

{!LANG-adc7282e8989942b68302a1573c3b18e!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

{!LANG-5a7db796a8904c69210524b6c0d13392!}

{!LANG-e4c85fde7aa0b6b94d366421f81bcd61!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-3937b8aa6e22262febc5fb2476eb4f65!}

{!LANG-01003f549c3d84369b61d9b08d947bef!}

{!LANG-c3b48ce792c5767d89d7ee49057a2272!}

{!LANG-230cac781dd61b6a60d481d31627d7d7!}

{!LANG-7e78c964b694dd5fe956bde01a106fa0!}

{!LANG-30bef67038e218a414b6eda3420d9562!}

{!LANG-d22b0718f82333820e63424f160697bf!}

{!LANG-e1c1d29bd12b5050db4395f6d9bb10b5!}

{!LANG-ed9393e1adbcd501973ab327061adecd!}

{!LANG-0ad2e45a70262e4e05277cce990d9468!}

{!LANG-3a8aefe4cb1573ede5ee1d1555722f0c!}
I explanations for the definition of the basic price of design work for the construction of housing and civil facilities
1 How to determine the costs of designing individual heat points (including and built-in) with a capacity of 0.8-1.5 Gcal / hour?
2 Did the base price of the kindergarten design, the cost of designing the laundry, food, germination?
3 How to calculate the cost of work on the fence of a residential complex?
4 How to calculate the cost of binding the elevator project for the hospital?
5 How to determine the cost of designing the ski slopes, lifts and veneers?
II standards for the preparation of technical documentation for the overhaul of buildings and housing structures
1 It is covered by the Regulation on the composition of the sections of the project documentation and the requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87 (Regulation), for the LCG "Regulations for the preparation of technical documentation for the overhaul of buildings and housing structures at 12.03. 2012 (SBCP 81-2001-05)
2 What include work on the preparation of technical documentation for the overhaul of facades of buildings and structures?
3 How to determine the cost of preparing technical documentation for the overhaul of balconies?
4 How to determine the cost of developing interiors in the overhaul of buildings and structures?
5 How to calculate the cost of capital repairs of a cafe for 100 seats?
6 How to determine the cost of overhaul of boiler rooms?
III Territorial Planning and Territory Planning
1 Is the price of lowering coefficients (0.4 and 0.6) in the SBTP 81-2001-01 "Territorial planning and planning of the territory" editorial. 2010?
2 What works include projects of planning territories and survey?
3 How to calculate the cost of implementing the planning organization of the land plot of the neighborhood?
4 How to calculate the cost of developing a project of building municipalities?
IV Communication Objects
1 How to determine the cost of designing security systems - television protection and observation system (Tson)?
2 Which tables of the recommended relative value of the development of sections of the design and working documentation of buildings and structures are applied to station structures (2 OS) SBCP 81-2001-02?
V Water supply and sewerage objects
1 What of the directories need to be guided by determining the cost of the sewer collector with a diameter of 1400 mm and a length of more than 5 km in an urban feature?
2 How to determine the cost of designing water letta structures?
3 How to determine the cost of designing wastewater pumping stations with a capacity of 0.0065 thousand m3 / hour?
4 How to determine the cost of designing a low-length drainage?
VI General Freeding Roads
1 How to determine the cost of the protection of existing engineering communications?
2 How to calculate the cost of developing project documentation for cash pockets for roads (for stopping sites)?
VII Communal Engineering Networks and Constructions
1 To which design objects include Tables No. 48 and 49 GSN "Directory of basic prices for project work in the construction of" Communal engineering networks and structures "(ICSP 81-2001-07), containing indicators of the recommended indicative relative cost of developing partitions of project working documentation?
2 What energy supply facilities included in the Basic price guide for design work in the construction of "Communal engineering networks and structures" ed. 2012 (ICSP 81-2001-07) belong to linear?
3 How to determine the cost of designing relay protection using integrated circuits?
4 How to determine the cost of designing lightning protection cables for the organization of high-quality communication as well as a fiber-optic communication line (Vols)?
5 How to determine the cost of designing the architectural illumination of the facade of the building?
6 How to determine the costs associated with the participation of the project organization on behalf of the Customer in the choice of the site (routes) for construction?
7 How to determine the cost of designing the airline (VL) with the presence of plots of 3 categories of complexity in CBP 81-2001-07 "Communal engineering networks and structures"?
8 How to determine the cost of designing electrical networks and electrical calculations?
9 Are the branch line to consumers (from the highway to the consumer) to consumers (from the highway to the consumer) in SBCP 81-2001-07?
10 How to determine the cost of designing air lines with a voltage of 0.4 kV and length of up to 1 km and less?
11 On the design conditions of power electrical cables up to 35 kV and the composition of the prepared project documentation
12 How to determine the cost of designing plumbing networks of one diameter and destination, but passing along different routes?
VIII Hunting Constructions and Designs, Water Rocking, Anti-Large Constructions and Events, Pile Foundations
1 In which cases, the coefficient to seismicity is applied on the reference book of basic prices for design work for construction "Blowed structures and structures, water supply, anti-rolled structures and events, pile foundations" ed. 2004?
IX clarification to determine the cost of performing other design or related work design
1 How does the tax take into account in the simplified tax system in the calculation of the value of the project work on the reference books of basic prices?
2 How is the basic price of design work calculated in the case when the design of the design object is greater than the double maximum indicator?
3 How to determine the cost of recruiting an object with additional equipment to ensure its uninterrupted power supply?
4 How to determine the cost of drawing up the instruction manual for the object of capital construction?
5 How to calculate fire risks? What percentage of the cost in the section "Fire safety" they make up?
6 It is covered by a provision on the composition of the sections of the project documentation and the requirements for their content, approved by the Decree of the Government of the Russian Federation of February 16, 2008 No. 87 (Regulation), for the LCG "Regulations for the preparation of technical documentation for the overhaul of buildings and structures of housing and civilian purposes" Approved Ministry of Regional Development of Russia Order No. 96 of 12.03.2012 (ICSP 81-2001-05)?
7 How to calculate the costs of major performers in accordance with MDS 81.35-2004?
8 When determining the cost of designing from the cost of construction, an analogue object is used. The cost of an analog object is defined taking into account the district coefficient. When determining the cost of designing, is it legitimately a project organization to apply the district coefficient to the salary of employees, if the cost of which the cost of design is taken, it already takes into account it?
9 How to determine the cost of exercising author's oversight for construction?
10 How to determine the cost of environmental impact assessment (EIA)?
11 How to determine the cost of pre-project development?
12 How to determine the cost of performing project work on demolition or dismantling objects and structures?
13 What is included in section 12 "other documentation" of provisions on the composition of the partitions of project documentation and requirements for their content, approved by the Decree of the Government of the Russian Federation of 02/16/2008 No. 87?
14 What is the basis in compiling a consolidated estimated calculation of the cost of construction?
15 What reduction coefficients should be administered in the calculation formula for the expenditure of construction and installation work in the total construction cost of less than 60% (for example, 18% and 28%)?
Applications
1 Indices to the prices for project work with the IU quarter of 1993 to the fourth quarter of 2013 (List)
{!LANG-f81a888fd4c8abc92fcf3a29ccb582bc!}